W076 Endist Tulsa of Department of the Army posted this Presolicitation on Oct 27, 2026. No response date is listed. NAICS 238210 (Electrical Contractors and Other Wiring Installation Contractors), product or service code Y1NZ (Construction of Other Utilities). Set-aside: Total Small Business Set-Aside (FAR 19.5). Place of performance: Oklahoma. Solicitation number W912BV26RA032.
*This Pre-Solicitation Notice is being updated to notify industry that the solicitation number for this requirement has been updated to W912BV27RA003. The Solicitation has been posted on 27 OCT 2026.
Pre-solicitation Notice
For
15kV Switchgear & Station Service Replacement
at Lake Tenkiller, OK
This is a PRE-SOLICITATION NOTICE for the construction of a 15kV Switchgear & Station Service Replacement at Lake Tenkiller, in Oklahoma. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings.
The U.S. Army Corps of Engineers – Tulsa District has been tasked to solicit for and award a contract to perform the 15kV Switchgear & Station Service Replacement at Lake Tenkiller, Oklahoma. The proposed design-bid-build project will be procured as a Small Business Set-Aside, firm-fixed price contract in accordance with Revolutionary FAR Overhaul (RFO) Part 15, Negotiated Procurement, using the Lowest Price Technically Acceptable approach. Tradeoffs will not be permitted.
Project Description:
The work includes Replace the three existing 15kV switchgear lineups for the generator breakers and station service transformer feeder breakers.
circuit breakers
13.8kV/480V, high-resistance grounded wye station service transformers
resistor.
are not reused.
feeders.
flash mitigation switches.
The estimated magnitude of construction for this project is between $5,000,000 and $10,000,000.
The North American Industrial Classification System (NAICS) Code for this procurement is 238210, Electrical Contractors and Other Wiring Installation Contractors, which has a small business size standard of $19M.
The Product Service Code is: Y1NZ (Construction of Other Utilities)
Estimated duration of construction of this project is 900 calendar days.
Anticipated solicitation issuance date is on or about 20 July 2026, and the estimated proposal due date will be on or about 19 August 2026.