City of Flagstaff (Arizona) posted this IFB on Oct 15, 2026. Responses are due Nov 12, 2026. Category: Construction - Building. Solicitation number 2027-508.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The project is located at the Jay Lively Activity Center in Flagstaff, AZ. The scope of work includes selective demolition of existing water-cooled chillers, evaporative coolers, pumps, air control devices, and piping, and the installation of two new air-cooled chillers, primary chilled water pumps, air control devices, and a hydronic reheat loop.
The scope of work includes selective demolition of existing water-cooled chillers, evaporative coolers, pumps, air control devices, and piping, and the installation of two new air-cooled chillers, primary chilled water pumps, air control devices, and a hydronic reheat loop. New equipment shall be connected to existing chilled water piping. The new reheat loop shall be connected to the existing heat exchanger HX-2. New controls devices, wiring, and programming shall be provided to integrate all new equipment into the existing BAS system. New chillers shall have BACnet communication.