City of Rogers (Arkansas) posted this RFQu on Oct 25, 2026. Responses are due Nov 10, 2026. Category: Architecture & Engineering. Questions are due 2026-11-04 16:00. Solicitation number OpenGov-15e82a84.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Rogers is requesting Statements of Qualifications (SOQs) from firms interested in performing Natural Channel Design services, including engineering, plan design, hydrologic and hydraulic modeling, and all associated and federal regulatory permitting for work around jurisdictional waters, wetlands, floodplains, and stream channels. The work is funded by the Climate Pollution Reduction Grant (CPRG) subaward from Metroplan to the City of Rogers (Subaward CPRG-NWA-001; EPA award 02F75801). Work under this grant is subject to all relevant local, state, and federal regulations, including the CPRG subaward provisions and EPA requirements.
The project consists of approximately 4,200 linear feet of stream restoration in an urban setting. The selected firm will be responsible for creating a stable channel design that follows natural channel design principles, creating a well-connected floodplain planted with ecoregion-specific native species, performing all necessary hydrologic and hydraulic calculations, preparing and filing all necessary permit documents at the local, state, and federal levels, and, if needed, submitting a Letter of Map Revision (LOMR) to FEMA. The design must meet the standards of the City of Rogers Drainage Criteria Manual and Chapter 22 of the City of Rogers Code of Ordinances.
This project has a schedule driven by the grant. Firms should demonstrate their ability to have construction plans complete and approved by the City, with all required permit applications submitted, by **May 1, 2027**. Construction work is intended to be completed by **December 31, 2027**. The Firm will coordinate with Metroplan on the EPA Cross-Cutter Report.
Submission
Submit SOQs as a PDF in OpenGov (preferred) or in hard copy to Colt Craig, 301 W. Chestnut St., Rogers, AR 72756, by **4:00 p.m. Central Time on November 10, 2026**.
Selection Process
The selection committee will review and score all SOQs received using the criteria below and will rank the firms. The highest-ranked firm will be asked to submit a detailed proposal based on a scope of work provided by the City and to negotiate a contract. Price is not a selection factor. Fees will be negotiated with the highest-ranked firm; if a fair and reasonable fee cannot be agreed, the City will end negotiations and proceed to the next-ranked firm. The contract is subject to City Council approval.
Required Submittal Contents
The SOQ is limited to 25 pages on 8.5" x 11" paper, including resumes. Each 11" x 17" page counts as two pages. Each firm must hold an active registration in SAM.gov and must not be suspended or debarred. The following forms are **required**:
Sign up free to get this document.