Install Concrete Pad for Metal Storage Building at Fire Station #63

Active FIRE-0302 IFBConstruction - BuildingCity of Santa Cruz
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

City of Santa Cruz (California) posted this IFB on Oct 30, 2026. Responses are due Nov 13, 2026. Category: Construction - Building. Solicitation number FIRE-0302.

Solicitation details

General information

Solicitation number
FIRE-0302
Notice type
IFB
Place of performance
California

Agency and category

Agency
City of Santa Cruz
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Install a concrete pad and utilities for a metal storage building. The concrete must meet all specifications on the plans and will be able to hold the weight of fire apparatus of approximately 55,000 lbs each. Bidders shall be aware that electrical, above-ground fire sprinkler & building installer vendors have been selected.

Scope

The following is the scope of work needed:

  • Demolition (saw cut and removal of existing AC material)
  • Utilities (trenching for electrical and fire sprinklers, electrical pipe installation)
  • Concrete Pad Installation (includes subgrade preparation, form work, rebar installation, concrete pour and finish work, AC conforms, building anchorage installation)
  • Remove existing storm drain inlet connection and install/connect new Bio-Retention Area.

Bidders shall review and adhere to the following:

  • Green Building Checklist
  • Site management & bmps per plans
  • Construction waste reduction, disposal and recycling
  • Product gwp compliance
  • Finish material pollutant control

Coordinate and work with other contractors as required to execute all work listed on plans.

Schedule, attend, and complete all required inspections for listed scope of work with the applicable City of Santa Cruz inspectors.

All refuse and recycling activities during construction must comply with Chapter 6.12 of the Santa Cruz Municipal Code and be accounted for on the Construction Waste Management Plan.

All work must comply with the building permit plans, as well as state and local codes.

Additional information

A **bid bond** is **required** for the project bid. A labor and performance bond and a materials bond will be required after the project is rewarded.

The total project budget shall not exceed **$200,000**. Bidders shall submit bids that are within this maximum amount.