UCLA Center for Health Sciences Fire Sprinkler Retrofit | School of Medicine,(5th & 6th floor) No. 906032

Active 0000040760 RFQuArchitecture & EngineeringUniversity of California, Los Angeles
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

University of California, Los Angeles (California) posted this RFQu on Oct 23, 2026. Responses are due Nov 16, 2026. Category: Architecture & Engineering. Questions are due 2026-10-30 10:00. Solicitation number 0000040760.

Solicitation details

General information

Solicitation number
0000040760
Notice type
RFQu
Place of performance
California
Questions due
2026-10-30 10:00

Agency and category

Agency
University of California, Los Angeles
Category
007Architecture & Engineering
Source listing
Link after sign-up

Description

From the agency listing

I. ADVERTISEMENT FOR EXECUTIVE ARCHITECT

UCLA requests a written response to this Request for Qualifications (RFQ) to select an Executive Architect for the proposed UCLA CHS Fire Sprinkler Retrofit - School of Medicine East 5th and 6th Floors project (Project #906032.01). The project will install fire sprinkler main supply lines in the public corridors on the fifth and sixth floors of the Center for Health Sciences (CHS), School of Medicine East building the proposed project construction area totals approximately 10,666 gsf. The new main lines would connect to existing fire sprinkler risers previously installed in the stairwells. This project is located in the School of Medicine East building, which is part of the Center for Health Sciences complex, located at 10833 Le Conte Avenue, on the UCLA campus.

The proposed scope of work includes removing the existing ceiling, lowering the ceiling plane, and installing a new single-span acoustical ceiling to accommodate fire sprinkler main lines and heads; installing new recessed LED light fixtures and mechanical diffusers; and extending all existing ceiling devices and ducts to the new ceiling plane. The sprinkler main lines would be installed above the public corridor ceilings, with connection points every 20 feet, to allow for current, future, and ongoing laboratory and suite renovations in the project area.

Construction costs are estimated at **$3 to $4 million**, and the scope may be prioritized or phased to align with available funds. Facilities Management Design and Project Management (FM/DPM) would manage the project under a delegation of authority from the Vice Chancellor and Chief Financial Officer.

Project implementation depends on the availability of funding. The Design shall comply with the University of California Policy on Sustainable Practices.

The selection committee will base its review of the Executive Architects' submitted proposals and selection on the identified Selection Criteria (Attachment A). The final selection and appointment of the Executive Architect is contingent upon project approval by the UC Board of Regents or their delegated authority.

The complete RFQ packet will be available at http://www.uclaplanroom.com on Friday, October 23, 2026. Responses to the RFQ are due by or before **10:00 a.m. on Monday, November 16, 2026**. To download the packet, you must create a login and password. Registration instructions are available at https://www.uclaplanroom.com/help/account.register. Once in the UCLA Planroom, click the "RFQ" tab and search for the project to download. Within the project "RFQ Document" tab, download (1) the RFQ, (2) the Planroom RFQ-Upload Instructions, and (3) Appendix C and D Instructions to ensure your documents are easily located within the Planroom. Failure to comply could result in your submission being overlooked.

Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Candidate Firm may be required to show evidence of its Equal Employment Opportunity policy.

Important dates | Advertisement period:10-23-11/16 | Questions due date: 10 a.m. 10/30 | Submission date:11/16

Peter E. Hendrickson, AIA
Associate Vice-Chancellor
Design and Construction
UCLA Capital Programs
1060 Veteran Avenue | Box 951365
Los Angeles, CA 90095-1365

For questions related to this RFQ, please contact:
Pi-Hsuan Kao
Principal Architect
UCLA Facilities Management
Design & Project Management
T: 310-924-5310
E: Pkao@fm.ucla.edu

Please note: Pi-Hsuan will be out until 11/2. Please refer questions during the RFI period to Ying-Ling Esfandi at Ylesfandi@fm.ucla.edu

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

UCLA requests a written response to this Request for Qualifications (RFQ) to select an Executive Architect for the proposed UCLA CHS Fire Sprinkler Retrofit - School of Medicine East 5th and 6th Floors project (Project #906032.01). The project will install fire sprinkler main supply lines in the public corridors on the fifth and sixth floors of the Center for Health Sciences (CHS), School of Medicine East building the proposed project construction area totals approximately 10,666 gsf. [...] This project is located in the School of Medicine East building, which is part of the Center for Health Sciences complex, located at 10833 Le Conte Avenue, on the UCLA campus.

Scope

The proposed scope of work includes removing the existing ceiling, lowering the ceiling plane, and installing a new single-span acoustical ceiling to accommodate fire sprinkler main lines and heads; installing new recessed LED light fixtures and mechanical diffusers; and extending all existing ceiling devices and ducts to the new ceiling plane.

The sprinkler main lines would be installed above the public corridor ceilings, with connection points every 20 feet, to allow for current, future, and ongoing laboratory and suite renovations in the project area. The new main lines would connect to existing fire sprinkler risers previously installed in the stairwells.

Additional information

The complete *RFQ* packet will be available at http://www.uclaplanroom.com on Friday, October 23, 2026. Responses to the RFQ are due by or before **10:00 a.m. on Monday, November 16, 2026**. To download the packet, you must create a login and password. Registration instructions are available at https://www.uclaplanroom.com/help/account.register.

Once in the UCLA Planroom, click the "RFQ" tab and search for the project to download. Within the project "RFQ Document" tab, download (1) the RFQ, (2) the Planroom RFQ-Upload Instructions, and (3) Appendix C and D Instructions to ensure your documents are easily located within the Planroom. Failure to comply could result in your submission being overlooked.

The selection committee will base its review of the Executive Architects' submitted proposals and selection on the identified Selection Criteria (Attachment A).

Construction costs are estimated at **$3 to $4 million**, and the scope may be prioritized or phased to align with available funds.

Similar open bids

In California

More from University of California, Los Angeles

Open bids