Longmont-to-Boulder (LoBo) Trail Jay Road Connection Project

Active BID-254-26 ITBConstruction - Heavy & CivilBoulder County
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Boulder County (Colorado) posted this ITB on Oct 15, 2026. Responses are due Nov 12, 2026. Category: Construction - Heavy & Civil. Solicitation number BID-254-26.

Solicitation details

General information

Solicitation number
BID-254-26
Notice type
ITB
Place of performance
Colorado

Agency and category

Agency
Boulder County
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Boulder County, in partnership with the City of Boulder, is requesting bids for the Longmont-to-Boulder (LoBo) Trail-Jay Rd Connection Project. The trail extension will begin at the Cottonwood Trail at Jay Rd and be aligned on the south side of Jay Road until turning north at the intersection of Jay Road and Spine Road. This project consists of concrete and soft surface trail construction, ditch lateral piping, fencing, tree removals, traffic and pedestrian signal, and erosion control.

Scope

The 2025 Standard Specifications for Road and Bridge Construction controls construction of this project. The following special provisions supplement or modify the Standard Specifications and take precedence over the Standard Specifications and plans.

The Contractor shall commence work under this Contract on or after the 5th day following contract execution, unless such time for beginning the work shall be changed by Boulder County in the "Notice to Proceed." Once work has begun, the contractor will have 70 working days to complete. The contractor shall notify Boulder County 30 days prior to start of construction.

Construction within the ditch lateral and any construction materially affecting the flow of water to any of the lateral users should be performed during the non-irrigation season (November 1st to April 1st). If work within the lateral will take place during the irrigation season, a temporary diversion shall be constructed to provide uninterrupted water to the lateral users.

The Contractor is required to obtain a Boulder County Stormwater Quality Permit for this project. [...] The Contractor is required to obtain a Boulder County Community Planning and Permitting Building and Grading Permit. This shall not be paid for separately but shall be included in the work.

The following items are included in the summary of approximate quantities:

  • Clearing and Grubbing, LS 1
  • Prairie Dog Management, LS 1
  • Field Office (Class 2), EA 1
  • Sanitary Facility, EA 1
  • Construction Surveying, LS 1
  • Mobilization, LS 1
  • Traffic Control Management, LS 1
  • Portable Message Sign Panel, EA 3
  • F/A Minor Contract Revisions, F/A 1

Additional information

Boulder County will provide electronic files of drawings, the sample contract document, the project technical specifications in PDF format, online at the designated internet bid advertisement site, and they will be considered as the official bid set and record set.

Contractor's work may be subject to the terms and conditions of certain third-party contracts, which will be incorporated by reference into any contract executed between Contractor and the County with respect to this Project. See agreement between Boulder County and the City of Boulder re: Temporary Access, Construction, and Wetland Mitigation for the Longmont-to-Boulder Regional Trail (LOBO Trail) and Agreement between Boulder County and Lateral Users of the Boulder and White Rock Ditch and Reservoir Company.

The Contractor will be responsible for establishing, documenting, and implementing a Quality Control Plan. [...] Boulder County will provide a qualified Construction Quality Assurance team to perform Quality Assurance (QA) testing, auditing and acceptance testing.

Documents

12 files

Sign up free to get these 12 documents.

  • 1. BID-254-26 LoBo Trail Jay Road Connection Project Plans.pdf
    Download
  • 2. BID-254-26 LoBo Trail Jay Road Connection Project Specifications.pdf
    Download
  • 3. Boulder County Construction Sample Contract.docx
    Download
  • 4. Exhibit A - Insurance Requirements.pdf
    Download
  • 5. LoBo Trail Jay Road Connection Project Bid Tabulation.pdf
    Download
  • 5. LoBo Trail Jay Road Connection Project Bid Tabulation.xlsx
    Download
  • 6. BoCo City of Boulder Agreement LoBo Jay Road plans removed.pdf
    Download
  • 7. Lateral Agreement LoBo Jay Road DRAFT.pdf
    Download
  • 8. Non-Mandatory Meeting (Virtual) Information.pdf
    Download
  • 9. Public Opening Information.pdf
    Download
  • Bid Bond Information.pdf
    Download
  • Vendor Information for Bonfire - Fillable.pdf
    Download

Similar open bids

In Colorado

More from Boulder County

Open bids