Town of Fairfield (Connecticut) posted this ITB on Nov 3, 2026. Responses are due Nov 17, 2026. Category: Construction - Heavy & Civil. Solicitation number 2027-21.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Town of Fairfield on behalf of the Department of Public Works (DPW) is looking for a bid to complete storm damage in the following two (2) locations; Lu Manor Drive and Whites Hill Lane.
The damage is asphalt, base layer, and possible sub-base layer. Please see the bid document for more specifications.
Price is to include all labor, materials, tools, equipment, plant, mobilization, permits, insurances, etc. required to properly complete the project.
PLEASE SUBMIT A SCHEDULE OF VALUES PER LOCATION WITH YOUR SUBMISSION
**Submissions due:** THURSDAY, NOVEMBER 12, 2026, 11:00 AM
Prices quoted must be firm, for acceptance by the Town of Fairfield, for a period of ninety (90) days.
**Bid bond (for ANY bid over $50,000):** The BID BOND furnished, as bid security, must be duly executed by the bidder as principal. It must be in the amount equal to five percent (5%) of the total estimated bid.
**Performance and payment bonds:** The successful bidder, within seven (7) business days after notification of award, will be required to furnish Performance and Labor and Material Bonds [...] equal to a hundred percent (100%) of the award.
Contracts and purchases will be made or entered into with the lowest responsible bidder meeting specifications, except as otherwise specified in the invitation.
Equipment, materials, and, or work executed shall be guaranteed for a minimum period of one (1) year against defective material and workmanship.
The Town of Fairfield, Fairfield Board of Education, its officers, officials, employees, and agents, Boards and Commissions are included as additional insured for all insurance policies, on a primary and non-contributory basis.
Provide subcontractor details if any are to be employed as part of this contract, including labor rates. Provide reference details of most recent similar scope projects performed.
Sign up free to get these 6 documents.