RFP027-34 Platt & Lincoln Well Rehabilitation

Active OpenGov-3d04089f RFPUtilities & EnergyCity of Meriden
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

City of Meriden (Connecticut) posted this RFP on Oct 30, 2026. Responses are due Nov 20, 2026. Category: Utilities & Energy. Questions are due 2026-11-13 16:00. Solicitation number OpenGov-3d04089f.

Solicitation details

General information

Solicitation number
OpenGov-3d04089f
Notice type
RFP
Place of performance
Connecticut
Questions due
2026-11-13 16:00

Agency and category

Agency
City of Meriden
Category
018Utilities & Energy
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Meriden's DPU-Water Department is seeking proposals from qualified contractors to perform comprehensive rehabilitation and inspection services for the Platt well (located off Coe Avenue) & Lincoln well (located off Oregon Road) in Meriden. The selected contractor will be responsible for the safe extraction, evaluation, and re-installation of the pumping equipment, alongside targeted chemical redevelopment to restore well efficiency.

Scope

  • Pull, disassemble, clean and inspect existing pumping equipment.
  • Upon completion of the inspection, provide a Pump Inspection Report detailing the condition of the equipment for our review.
  • No repairs will be made without prior written authorization from the city.
  • Complete pre-cleaning video inspection of well casing & screen providing a digital copy.
  • Set, maintain and later remove developing tools including triple agitator surge block and submersible can or centrifugal pump.
  • Set up equipment and conduct a minimum 1-hour pre-cleaning flow test.
  • Redevelop each well for up to 36 hours by a combination of chemical treatments and mechanical surging & pumping.
  • All chemical solutions will be neutralized in a temporary holding tank prior to being discharged to waste at a location designated by the city.
  • Complete post-cleaning video inspection of well casing & screen providing a digital copy.
  • Disinfect well by the addition of a minimum 50ppm chlorine solution.
  • Reassemble, install and test reconditioned pumping equipment.
  • Prepare and deliver a detailed *Well Cleaning Report* summarizing the on-site activities, data collected and any equipment modifications.

Additional information

The City will only be accepting electronic submissions of proposals. Please submit electronic responses via the City eProcurement Portal: https://procurement.opengov.com/portal/meridenct. By way of the eProcurement Portal, responses will be locked and digitally encrypted until the submission deadline passes. Proposals are due for submission no later than **11:30 am, Friday, November 20, 2026**.

Proposers are to examine all documents and visit the site in order to make a thorough examination of the conditions so that they may familiarize itself with all of the existing requirements, conditions, and difficulties that will affect the execution of the work [...].

The Purchasing Officer reserves the right to make a selection on the basis of qualifications, experience in providing similar services elsewhere, the proposal's responsiveness to the Request For Proposal requirements; and to negotiate a contract with the Contractor.

The successful consultant shall be required to provide a Certificate of Insurance denoting general liability, automobile liability, workers compensation liability, and other coverage required by the City's Risk Manager.

The City of Meriden, unless stated otherwise in the documents or Contract, will make payment to the Contractor not less than thirty (30) days following completion of services.

The Agreement for the work will be via Purchase Order and Standard Contractors Services Agreement.

Documents

2 files

Sign up free to get these 2 documents.

  • RFP027-34_Platt_&_Lincoln_Well_Rehabilitation.pdf
    Download
  • Contractors_Agreement.pdf
    Download

Similar open bids

In Connecticut

More from City of Meriden

Open bids