Department of General Services (District of Columbia) posted this RFP on Nov 2, 2026. Responses are due Nov 12, 2026. Category: Construction - Building. Solicitation number OpenGov-e4aa9e9c.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The District of Columbia (the “District”) Department of General Services (“DGS” or the “Department”), on behalf of the District of Columbia Public Schools (“DCPS”) is seeking a design-builder (the “Design-Builder” or “Contractor”) to perform this scope of work at the Cardozo Education Campus HVAC Upgrades (“the Project”).
This Project addresses system aging, operational deficiencies, and deferred maintenance through a targeted program of capital renewal and system optimization. The work includes replacement and upgrades of select HVAC equipment, repairs to existing systems, enhancements to the building automation system (“BAS”) and controls, comprehensive preventive maintenance measures, and retro-commissioning to restore and verify system performance.
The Project design-to-budget is **$3, 500,000** for construction hard costs.
Project Goals
Performance Criteria
The scope of the Project generally includes, but is not limited to, the following. The Contractor shall:
The Contractor’s scope of work will be divided into two Phases: (i) the Design and Preconstruction Phase; and (ii) the Construction Phase.
**Site visit:** The Contractor shall be required to visit the site, become familiar with local conditions under which the work is to be performed, and correlate personal observations with requirements of the performance criteria and scope of work.
The Contractor shall include with the proposal a recovery plan to address potential non-conforming products or services, such as damaged materials or errors in measurement.
The Design-Build Fee shall be allocated with fifteen percent (15%) of the Design-Build Fee to the Preconstruction Phase (“Preconstruction Fee”), and eighty-five percent (85%) to the Construction Phase.
Allowances
Project Delivery Schedule