City of Fort Myers (Florida) posted this Sole Source on Oct 16, 2026. Responses are due Nov 6, 2026. Category: Utilities & Energy. Solicitation number OpenGov-8df92986.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
This is not a formal solicitation and there are no submissions required. The proposed action is for product or services for which the City intends to negotiate and award with only one source under the authority of and in accordance with Florida State Statute 287.057(3)(c).
This is a Notice for a Sole Source designation for the City of Fort Myers.
To date, the above listed supplier has been identified as the exclusive source for this product/service. Notice is hereby provided that the above product/service may be a sole source.
Product or Service Required:
reduces the rotational speed of a motor while increasing torque output
Justification for Sole Source Acquisition:
This equipment is essential to the reliable operation of the wastewater treatment process and supports the facility’s ability to consistently meet permit requirements. Its availability helps maintain treatment capacity, prevent process interruptions, and reduce the risk of equipment failures that could compromise effluent quality or result in permit violations.
Any supplier that believes they are capable of providing the same type of product/service should submit product information, statement of qualifications, and/or capabilities, as applicable, through question #2 under the vendor questionnaire section for consideration by the department requesting the item no later than the due date and time.
This posting will remain active for fifteen (15) calendar days. The Purchasing Agent must be notified by **email only** (kzimmerman@fortmyers.gov) within this fifteen-day period.
Any responses received as a result of this shall be considered solely for the purpose of determining whether to conduct a competitive procurement. Responses will not be considered as proposals, bids, or quotes.
Sign up free to get these 2 documents.