Kenton County Airport Board (Kentucky) posted this RFQu on Nov 4, 2026. Responses are due Dec 3, 2026. Category: Architecture & Engineering. Questions are due 2026-11-19 23:59. Solicitation number OpenGov-790ab1c4.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Kenton County Airport Board (“KCAB”) will receive proposals for Airside and Landside On-Call Engineering Services.
KCAB selected Consultant through Request for Qualifications #26-053- RFQ (the “RFQ”) to provide consulting services pertaining to the Airside and Landside On-Call Engineering Services.
Consultant must furnish work and services as specifically assigned by KCAB including the furnishing of labor, material, equipment, personnel, supervision, tools, and all other items and facilities necessary to provide on-call engineering services for airside and landside. The work and services are described further in the Request for Qualifications (#26-053- RFQ) and the Consultant’s response to same which are incorporated in their entirety by reference.
Services provided by the Consultant will be assigned by KCAB through separate contracts which incorporate in full, these Standard Contract Terms and Conditions. Each contract must set forth the specific scope of services, the schedule for completion of the services, any deliverables, the amount of compensation to be paid for services, and any other matters as may be mutually agreed to between KCAB and Consultant. Consultant and KCAB will negotiate an amount for services rendered under each contract on a case-by-case basis. The Consultant’s fee schedule is set forth on *Schedule 1*, attached and incorporated by reference.
**Proposals must be received by Thursday, December 3, 2026 at 2:00 pm.** No proposals will be accepted after that time unless such date or time is extended pursuant to an addendum issued by KCAB.
Insurance
Prior to execution of the Contract, Consultant must furnish KCAB with certificates evidencing existence of valid policies of insurance with the coverages specified, including evidence of Kentucky worker’s compensation insurance, and naming KCAB additional insured.
Sign up free to get these 2 documents.