The Town of Falmouth, Maine is soliciting qualifications for a Construction Manager at Risk (CM) to provide additions and renovations to the existing Central Fire Station at 8 Bucknam Road and a new Falmouth West Station at 5 Winn Road – see included schematic floor plans for more information. Central Station must remain fully operational during construction and site logistics will be a critical component on not impeding on the employees. The Construction Manager at Risk (CM) responsibilities will include providing pre-construction estimating and constructability services and full management of the construction process including bidding of construction documents to pre-qualified subcontractors, on site construction management services, and final close-out of the project.
The Town of Falmouth is on the upcoming CDS Federal budget for Fiscal Year 27 for $4,000,000. If approved, the projects are subject to all federal regulations including Buy America / Build America (BABA) and will have Davis Bacon wages.
Responsibilities of the CM
The CM will be expected to perform services consistent with the industry-accepted role of a Construction Manager at Risk. In general, they will include, but will not necessarily be limited to:
1. Attending and participating in the meetings with the Town and/or Architect, as necessary, throughout the design and construction processes.
2. Providing recommendations regarding constructability, materials and equipment selections, and proposed cost savings measures.
3. Maintain an overall project cost including soft costs.
4. Provide paperwork required by the federal grant if secured.
5. Assuming change of and responsibility for construction scheduling and cost estimating.
6. Qualifying sub-contractors.
7. Letting sub-contracts for bid.
8. Providing a GMP.
9. Providing a performance bond and payment bond and all state and federal mandated insurances.
10. Holding sub-contractors for construction.
11. Managing the construction including coordination, inspection, supervision, safety, and quality control services.
12. Maintaining construction phase records and accounting.
13. Ensuring all subcontractors maintain required insurance coverage.
Each is expected to prepare a written statement of qualifications in response to this RFQ/RFP to be submitted **by email** to Colin Shea no later than **Tuesday November 17, 2026, at 3:00 p.m**. Only one electronic copy delivered by email to Colin Shea is required. Submittals received after that date and time will be disqualified. Clearly title the email and mark the cover of the submittals with the words “CM Response to Falmouth Fire Stations RFQ/RFP.”
The statement of Qualifications must be 50 pages or less. Item 6 (*AIA A305*) and Item 7 (Fees) are submitted in separate files.
Scoring
Scoring will be based on a 100-point criterion:
Approximately three prospective CMs will be selected for interviews. A total of 100 points will be awarded in the interview for final selection and added to the original score. The Town will negotiate a CM-at-Risk Agreement *AIA A133-2019*.