City of Fremont (Nebraska) posted this IFB on Nov 2, 2026. Responses are due Dec 8, 2026. Category: Utilities & Energy. Solicitation number FREMONTNE-433.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Sealed Bids will be received by the Department of Utilities of the City of Fremont, Nebraska at the office of the City Clerk, 400 East Military Avenue, Fremont, Nebraska, until **2:00 PM CDT, on Tuesday, December 8th, 2026**, for the purchase of the following:
Steel Transmission Structures
The Work includes furnishing a complete material and equipment package, including but not limited to, all specified steel structures, arms, brackets, hardware, anchor bolts, drawings and steel calculations.
Deliver to site, drop staking, City of Fremont, NE.
Bids received after the above specified time for opening will be returned unopened to the sender.
Specifications are available by request at the office of the Transmission & Distribution, 3000 E. 1st St, Fremont, Nebraska, 68025 (Phone 402-727-2613).
Each proposal shall be sealed in an envelope marked “BID FOR STEEL TRANSMISSION STRUCTURES”.
Each bidder shall submit with each proposal a certified check or bid bond by a nationally recognized company, countersigned by a resident agent, payable to the City Treasurer of the City of Fremont, Nebraska, the amount of which shall be not less than five percent (5%) of the bid price and which shall guarantee good faith on the part of the bidder and the entering into Contract within 30 days after notification of acceptance at the price bid.
A **performance bond** in the amount of **100% of the Contract price** will be required of the successful bidder at the time of execution of Contract.
Bids will be evaluated by the City, based on quality, time required for delivery, experience of the Contractor, adherence to the contract requirements, and as required by federal bidding requirements.
Bidders may not withdraw bids for a period of sixty (60) days after the date of the bid opening.
Sign up free to get this document.