North Texas Tollway Authority (Texas) posted this IFB on Oct 30, 2026. Responses are due Nov 19, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-11-12 17:00. Solicitation number B2600001099.
Remove and replace mainlane, ramps and direct connectors pavement markings with 100 mil thermo and delineators.on Dallas North Tollway from PGBT to SRT and Lewisville Lake Toll Bridge.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Remove and replace mainlane, ramps and direct connectors pavement markings with 100 mil thermo and delineators.on Dallas North Tollway from PGBT to SRT and Lewisville Lake Toll Bridge.
The Work to be performed under this Contract shall be completed in full in 150 calendar days from the date of the Notice to Proceed.
Project Description
Remove and replace mainlane, ramps and direct connectors pavement markings with 100 mil thermo and delineators.on Dallas North Tollway from PGBT to SRT and Lewisville Lake Toll Bridge.
DESCRIPTION: MAIN LANES AND RAMPS RESTRIPE OF PAVEMENT MARKINGS
NET LENGTH OF PROJECT: 39,680 FT = 7.52 MILES
Submission
Bidders are encouraged to upload their bids to NTTA's Marketplace (https://www.nttamarketplace.org), no later than the date and time identified above as the "Bid Due Date". Alternatively, if electronic submittal is not possible, a physical response may be submitted to the above address.
To be considered for this procurement, each Bidder MUST include with their Bid Sheet, all REQUIRED documents, as identified in the Table of Contents.
Bid Bond
Accompanying this Proposal is a Proposal Guaranty in the form of a cashier's check, or teller's check, or a bank money order, or a bid bond for FIFTY THOUSAND AND NO/100 DOLLARS (**$50,000.00**).
Contract Term
5 months
Small Business Goal
10%
Bid Opening
November 19, 2026 at 03:00 p.m. CT, Virtual Bid opening