Collin County Community College District (Texas) posted this RFP on Oct 16, 2026. Responses are due Nov 13, 2026. Category: Construction - Building. Solicitation number OpenGov-dd5da750.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Collin College is seeking qualified proposals for the Frisco Library Roof Replacement Project.
This Thermoplastic Polyolefin (TPO) and Standing Seam Roof Project will involve the installation of a durable, high-performance roofing system designed to provide long-term protection, energy efficiency, and weather resistance. The project includes the installation of a TPO roofing membrane on designated low-slope roof areas and a standing seam metal roofing system on sloped roof sections.
The project includes the installation of a TPO roofing membrane on designated low-slope roof areas and a standing seam metal roofing system on sloped roof sections. Each roofing system is selected to meet the specific requirements of the building while providing reliable protection against rain, wind, UV exposure, and other environmental conditions.
Quality control inspections will be conducted throughout the installation process to verify compliance with project specifications, manufacturer requirements, and applicable building codes.
**Additive Alternate Number 1**: Remove and Replace existing Metal Roof Assembly. This Alternate shall provide Add/Deduct (circle one) pricing to the Reroofing Base Proposal to provide addded scope of work for existing metal roof areas as identified in drawings.
Cash allowances are hereby established for Owner's Contingency, Scope of Work items and materials in the amounts listed below and shall be included in the Contract Sum. [...]
No substitution will be considered prior to receipt of proposals unless written request for approval has been received by the Architect at least seven (7) days prior to the date for receipt of proposals.
Enter unit price on *Proposal Form*.