City of Frisco (Texas) posted this IFB on Oct 23, 2026. Responses are due Nov 12, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-11-05 17:00. Solicitation number 2710-007.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
This project involves removing the existing asphalt parking lot, removing portions of concrete curb and gutter, excavating, and repaving the parking lot with either 3” inches of Type D asphalt over 6” lime stabilized subgrade or 5” TxDOT flexbase. The project also includes modifying the driveway and removing and replacing small sections of sidewalk.
This project involves removing the existing asphalt parking lot, removing portions of concrete curb and gutter, excavating, and repaving the parking lot with either 3” inches of Type D asphalt over 6” lime stabilized subgrade or 5” TxDOT flexbase. The project also includes modifying the driveway and removing and replacing small sections of sidewalk.
The project must begin by January 15, 2027, and the contract time is 60 calendar days. Liquidated damages are $1,000 per day if the project is not completed within 60 calendar days from the start date.
**Submission:** Bids may only be submitted electronically via Bonfire at friscotexas.bonfirehub.com, with required bid bond and signatures. Bids will be publicly opened and read at **10:00 a.m. on Thursday, November 12, 2026** in Frisco City Hall.
**Bid guaranty:** Bidders must submit with their bids a cashier's check in the amount of five percent (5%) of the maximum amount bid, payable without recourse to the OWNER or a Bid Bond in the same amount from an approved Surety Company. Electronic bids will require the Bidder to provide the original signed hard copy within three (3) business days of the notification of Intent to Award.
**Bonds:** The successful Bidder must furnish performance and payment bonds each in the amount of 100 percent (100%) of the Contract price from an approved Surety Company holding a permit from the State of Texas, to act as Surety. The CONTRACTOR will be required to provide a Maintenance Bond in the amount of 100 percent of the Contract.
**Site visit:** Bidders are expected to inspect the site of the Project and to inform themselves regarding local conditions and conditions under which the Project is to be done.