Greene County (Virginia) posted this IFB on Nov 2, 2026. Responses are due Feb 9, 2027. Category: Construction - Heavy & Civil. Solicitation number 130918.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Project includes, among other things the Design and Construction of (a) the new Route 670 Connection, (b) Route 29 auxiliary lanes, (c) right of way acquisition, (e) traffic signals, (f) drainage, (g) signing and pavement marking, (h) stormwater management, (i) Transportation Management Plan, (j) erosion and sediment control, and (k) utility relocations within the Project limits.
The Project includes, among other things the Design and Construction of (a) the new Route 670 Connection, (b) Route 29 auxiliary lanes, (c) right of way acquisition, (e) traffic signals, (f) drainage, (g) signing and pavement marking, (h) stormwater management, (i) Transportation Management Plan, (j) erosion and sediment control, and (k) utility relocations within the Project limits.
Due to sign constraints on eVA, drawings and other documentation is available on shared drive with link listed within Part 1.