Port of Bremerton (Washington) posted this RFQu on Nov 3, 2026. Responses are due Nov 13, 2026. Category: Architecture & Engineering. Solicitation number 03-26-30045.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Port of Bremerton is soliciting the submission of professional engineering consulting services Statement of Qualifications (SOQ) for the design of a pedestrian path which replaces the existing boardwalk structure.
Notice is hereby given that Port of Bremerton is soliciting statements of Qualifications (SOQ) from firms interested in providing consulting engineering services for the Port Orchard waterfront pedestrian promenade redesign.
This contract is for professional engineering consulting services. The Port of Bremerton reserves the right to inquire into the proposer's ability to provide Professional Services and verify project references. The successful firm will be required to execute an A&E Professional Services contract agreement with the Port.
Qualifications will only be accepted from firms that can demonstrate having a background in A/E services in civil engineering, permitting on waterfront areas, and the successful completion of projects of a similar nature.
The Port may negotiate professional services agreements to be executed in a basis of an initial scope of individual tasks with the intent to amend the agreement when construction and future services are negotiated such as bidding support and construction observations services. [...]
The existing Port Orchard waterfront boardwalk has been condemned and is structurally unsafe. [...] The Port Commission has reviewed conceptual design direction and chose to move forward with a concept which removes the existing wooden boardwalk structure and replaces it with a 12' pedestrian promenade on land. This path will require design of the promenade, redesign of the parking lot layout, plans for the removal and disposal of the existing boardwalk, and permit assistance.
This RFQ will result in awarding an agreement to be executed on a task-basis. The first task will be related to the removal of the existing boardwalk structure, design of the new promenade, and re-design of the parking lot. The goal is to not have a net loss of any parking spaces as a result of the new design. The Port intends to have construction in phases, with the promenade being the priority. The resurfacing of the parking-lot would be at a later date, with a separate negotiated task for construction and observation services.
The Port may negotiate individual task orders with the awarded consultant for services to assist with grant applications to secure funding for the listed projects.
SOQs are to be submitted electronically through https://mrscrosters.bonfirehub.com. Responses are due no later than **November 13, 2026, at 4:00 PM**.
Responses are to be uploaded and submitted electronically as one .pdf format file through https://mrscrosters.bonfirehub.com/.
No cost or fee schedules shall be submitted with your proposal. Consultants will be selected on the basis of their qualifications and experience, with fees determined through negotiations following selection.
Consultants will be selected based on the following criteria:
Total possible points = 100
The evaluation committee may choose to conduct interviews with the top-ranked proposer in order to make a final recommendation and selection.
Contract Award (anticipated) 12/08/26
Sign up free to get this document.