City of Redmond (Washington) posted this RFQu on Nov 3, 2026. Responses are due Nov 20, 2026. Category: Architecture & Engineering. Questions are due 2026-11-11 17:00. Solicitation number REDMOND-364.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Redmond (Redmond or the City) is soliciting interest from consulting firms under this Request for Qualifications (RFQ) for design services for the construction of the 150th Ave NE Improvements project. The successful consultant/team will prepare a design report, permits, plans, specifications, and estimates.
The primary goal of the project is to widen 150th Ave NE in the vicinity of the 4600 Block to provide adequate roadway space for new on-street bicycle lanes, filling the gap between existing bike lanes to the north and south. A new RRFB crossing will also be included near Microsoft Building 126.
Right of way acquisition is necessary for the project and will be led by the consultant team.
Consultant shall provide preliminary and final engineering design services and other work including:
Optional Services
The City, at its discretion, may supplement the scope of services to include any or all of the tasks noted below.
Submittal Requirements
Submittals must be received by **4:00 p.m. November 20, 2026**. Submittals shall be in **PDF format and emailed to mross@redmond.gov**, with “150th Avenue Improvements RFQ” and company name in the subject line. Email attachment size limit is 20 MB. Late submittals will not be evaluated.
Maximum of 15 pages. Font size to be a minimum of 11 pt Arial (or equivalent) and margins are to be a minimum of 0.5” on all sides.
Evaluation Criteria
Agreement and Insurance
The selected firm(s) will be required to enter into a *Local Agency A&E Professional Services Negotiated Hourly Rate Consultant Agreement* (published by WSDOT) with Redmond. The selected firm(s) must have insurance as outlined in the Consultant Agreement (Appendix A).
Contract award anticipated March 2027.
Sign up free to get this document.