FA2835 AFLCMC Hanscom Pzi of Department of the Air Force posted this Special Notice on Oct 26, 2026. Responses are due Sep 30, 2027. NAICS 236220 (Commercial and Institutional Building Construction), product or service code Z2QA (Repair or Alteration of Restoration of Real Property (Public or Private)). Place of performance: Massachusetts 01731. Solicitation number HERO-FY27.
1. BOTTOM LINE UP FRONT (BLUF)
The Department of the Air Force, specifically the 66th Civil Engineer Squadron (66 CES) at Hanscom Air Force Base (AFB), Massachusetts, is publishing this Umbrella Program Notice to announce the establishment of Hanscom’s Execution & Rapid Operations (HERO) acquisition framework. Operating under the innovative statutory authority of 10 U.S.C. § 2808a, HERO seeks to completely modernize base infrastructure and execute facility repair and construction projects using flexible, commercial-style Other Transaction Agreements (OTAs). Traditional Federal Acquisition Regulation (FAR) rules do not apply, enabling the Air Force to engage directly with local, regional, and national commercial builders who have limited or no prior federal contracting experience.
2. PROGRAM STRUCTURE & TIMELINE
Rather than a single, one-off project solicitation, this Notice establishes the HERO Umbrella Program, which will remain active for one (1) full year from the date of this posting. During this 12-month period, the Government will periodically publish project-specific solicitations, referred to as Areas of Interest (AOIs), directly under this umbrella.
Each independent AOI will outline:
3. ELIGIBILITY & PARTICIPATION
The HERO framework actively seeks to lower barriers to entry. Unlike prototype OTAs, 10 U.S.C. § 2808a carries no statutory Nontraditional Defense Contractor (NDC) prerequisites and zero cost-share mandates. Commercial general contractors, specialty trades, design-build firms, and joint ventures are all fully eligible and strongly encouraged to monitor this notice and participate.
4. ACTION REQUIRED FOR INTERESTED VENDORS
Interested commercial builders and designers should take the following immediate steps to prepare for upcoming HERO projects:
Form Teaming Alliances: Begin networking with regional design firms, general contractors, and trade subcontractors to build integrated design-build consortia capable of executing rapid, commercial-style projects.
Sign up free to download this file.