Alaska Native Tribal Health Consortium (Alaska) posted this IFB on Nov 4, 2026. Responses are due Nov 27, 2026. Category: Construction - Building. Solicitation number 27-B-13906.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
ANTHC (Owner) is requesting Bids for the construction of the above-named Project.
This project is for the replacement of the clean steam generation system. Work includes phased demolition of the steam-to-steam heat exchanger, clean steam feedwater storage tank, feedwater pumps and associated plant and clean steam and condensate piping. New steam-to-steam heat exchangers for an N+1 system, feedwater storage tank, feedwater pumps, and reverse osmosis system will be installed. Additional work outside of the boiler room will involve removing the existing Sanipak from the clean steam system and refeeding the sterile processing depart with new stainless-steel piping. Integration with the existing Building Automation System will be required using Siemens Desigo user interface. Areas of work are confined to the basement and level 3 mechanical room.
The Contractor shall furnish all labor, materials, equipment, tools, services, testing, and incidentals to complete all Work required by these Specifications and as shown on the Drawings.
This project is for the replacement of the clean steam generation system. Work includes phased demolition of the steam-to-steam heat exchanger, clean steam feedwater storage tank, feedwater pumps and associated plant and clean steam and condensate piping. New steam-to-steam heat exchangers for an N+1 system, feedwater storage tank, feedwater pumps, and reverse osmosis system will be installed. Additional work outside of the boiler room will involve removing the existing Sanipak from the clean steam system and refeeding the sterile processing depart with new stainless-steel piping. Integration with the existing Building Automation System will be required using Siemens Desigo user interface. Areas of work are confined to the basement and level 3 mechanical room.
**Submission:** Bids must be uploaded to the Bonfire portal (https://anthc.bonfirehub.com/login) prior to the established deadline. Bidders will not be able to upload bids to the Bonfire portal after the stated deadline. Emailed bids will not be accepted.
A **mandatory** site visit will be conducted on November 12, 2026, at 9:00 AM at 4315 Diplomacy Drive. Attendance at this site visit is a condition of eligibility to submit a bid under this IFB. ANTHC will conduct a second, voluntary site visit on November 18, 2026, at 9:00 AM at 4315 Diplomacy Drive.
A Bid must be accompanied by Bid security made payable to Owner in an amount of five (5) percent of Bidder's maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond [...].
The Project has a substantial completion date of September 10, 2027, and an expected completion date of October 1, 2027.
Award will be made to the lowest responsive and responsible bidder.