City of Pasadena (California) posted this IFB on Nov 5, 2026. Responses are due Dec 3, 2026. Category: Construction - Heavy & Civil. Solicitation number 2026-IFB-CIV-0063.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Pasadena, in coordination with the California Department of Transportation (Caltrans), proposes to rehabilitate and seismically retrofit the existing two-lane Holly Street Bridge (No. 53C1041) over the Arroyo Seco Channel, the Arroyo Seco Trail (a Class 1 multi-use trail), and North Arroyo Boulevard.
The project includes seismic retrofit and comprehensive bridge rehabilitation work including deck treatment, repair of spalled concrete, and rehabilitation of bridge girders with exposed reinforcing steel to address identified structural deficiencies and extend the service life of the facility.
In addition, the project includes upgrades to bring adjacent pedestrian facilities (sidewalk, curb and gutter, and new curb ramps) into compliance with current Americans with Disabilities Act (ADA) standards, specifically at the intersection of Linda Vista Avenue and Holly Street.
The project is funded by the Federal Highway Administration (FHWA) through the Highway Bridge Program (HBP), authorized by United States Code (U.S.C.) Title 23 and administered by Caltrans. The Contractor is required to comply with all applicable federal, state, and local laws, regulations, and requirements associated with federally funded projects.