Valley Water (California) posted this IFB on Oct 20, 2026. Responses are due Dec 8, 2026. Category: Utilities & Energy. Solicitation number VW0725.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Pacheco pumping plant is a remote facility located in Merced County, on the western side of the San Luis Reservoir. PPP is operated by Valley Water and is owned by the United States Bureau of Reclamation (USBR).
The Contractor shall furnish all materials, incidentals, auxiliaries, and labor compliant with prevailing wage requirements—led by a trained and certified supervisory-level mechanic—to document, remove, transport, disassemble, inspect, rebuild, reinstall, and test the pump and 24” cone valve in accordance with these specifications and industry best practices.
The Contractor shall also coordinate with Valley Water staff to complete all tasks, including, but not limited to, scheduling, work progress, witness inspections, deviations, and all other matters pertaining to the work.