River Ranch Road Improvements

Active 10327 ITBConstruction - Heavy & CivilVillage of Estero
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Village of Estero (Florida) posted this ITB on Oct 30, 2026. Responses are due Dec 9, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-11-20 11:00. Solicitation number 10327.

Solicitation details

General information

Solicitation number
10327
Notice type
ITB
Place of performance
Florida
Questions due
2026-11-20 11:00

Agency and category

Agency
Village of Estero
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Village of Estero, FL invites the submission of a proposal from interested and qualified for-profit or not-for-profit corporations, partnerships, or registered joint ventures authorized to do business in the state of Florida to compete to provide the items and/or perform the services specified in this Invitation to Bid (ITB).

The work includes the construction of two raised crosswalks, sidewalk connections, pedestrian-activated rapid flashing beacon assemblies and a turn lane.

This project is funded in whole by local funds.

Scope

The work includes the construction of two raised crosswalks, sidewalk connections, pedestrian-activated rapid flashing beacon assemblies and a turn lane.

All proposed improvements are to be built as shown in the plans.

The scope of work shall include all activities required to install the proposed improvements, including but not limited to: mobilization; construction layout; maintenance of traffic; selective clearing and grubbing; saw-cutting and removal of existing asphalt pavement and curb; roadway widening, earthwork, subgrade stabilization, base and asphalt paving; raised crosswalk construction and transitions; sidewalk and detectable warning surface work; drainage installation/adjustment; pedestrian-activated rapid-flashing beacon assemblies and signs; pavement markings and signage; restoration; testing; cleanup; and final inspection.

This bid includes costs for the HOA work shown on the crosswalk plans, this work may be included in the contract pending costs and agreements with the HOA.

  • Mobilization: Provide all labor, tools, equipment, traffic control, and safety setups per project area.
  • Maintenance Of Traffic: Provide and maintain all required maintenance-of-traffic devices, warning signs, barricades, channelizing devices, temporary markings, and pedestrian protections for the duration of construction. [...] All costs associated with MOT are fully absorbed within the awarded Bid. No separate payment, extra work orders, or additional costs will be approved or paid by the Owner for these activities.
  • The contractor shall provide temporary striping and markings (painted) within 3 days of final asphalt surfaces
  • The contractor shall provide permanent thermoplastic striping and markings after 30 days of final asphalt surfaces.

Additional information

**Submission method:** The Village is accepting sealed electronic bids in EUNA PROCUREMENT due by the date and time posted on this solicitation. Bids sent in any manner other than electronically via EUNA PROCUREMENT will not be accepted. Hard copies, faxed bids, and electronically submitted bids sent directly to the Village will not be accepted.

All bid documents submitted must be PDF/A compliant.

**Basis of Award.** The contract for all services will be awarded to the overall lowest, responsive and responsible bidder (Grand Total) meeting all specification requirements.

Required submittals:

  • Documentation of a minimum of three (3) years of experience in roadway improvements and construction similar in size and scope as to what is being requested herein. Provide a minimum of three (3) similar size accounts that your firm has been providing to prove the required experience.
  • Insurance – A certificate of insurance or letter from your insurance company stating that, if awarded the bid, your firm can meet and obtain the insurance requirements as specified

It will be the bidder's responsibility to visit the site of this work and acquaint themselves with conditions as they exist and operations to be carried out under this bid.

WORK SCHEDULE: Monday through Friday from 7:00 AM to 5 PM excluding Village observed holidays.

The Village will accept monthly invoices for completed work and will pay via check Net 30 days from receipt of invoice.

Documents

7 files

Sign up free to get these 7 documents.

Similar open bids