City of Covington (Georgia) posted this RFP on Oct 20, 2026. Responses are due Jan 12, 2027. Category: Construction - Heavy & Civil. Questions are due 2026-12-01 15:00. Solicitation number PE-70750-NONST-2027-000000084.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Covington, Georgia (the "City") requests proposals from qualified contractors to provide on-call stormwater rehabilitation and maintenance construction services on an annual contract. Work will be authorized through individual written Task Orders, except for emergency work authorized under Section 2.1.1. The City does not guarantee any minimum quantity, dollar value, frequency, or type of work under the resulting contract.
The Contractor shall furnish supervision, labor, materials, equipment, transportation, permits assigned to the Contractor, traffic control, erosion control, testing, cleanup, and incidentals necessary to complete each authorized Task Order. Typical work may include:
Storm-drain cleaning, CCTV inspection, cured-in-place pipe, sliplining, geopolymer lining, and other specialized stormwater trenchless rehabilitation are outside the base pricing schedule unless added by addendum or authorized as unlisted work.
ALL BIDS MUST BE SUBMITTED IN A SEALED ENVELOPE OR PACKAGE.
Submit one (1) hard copy and one (1) copy on a USB drive. The sealed envelope or package shall be addressed to the attention of Maranna Gilbert and clearly labeled "RFP / Bid No. 2026-26 - On-Call Stormwater Rehabilitation and Maintenance Annual Contract."
Proposals must be received by Tuesday, January 12, 2027 at 10:00 AM. Each proposer is responsible for ensuring timely receipt by the City, regardless of delivery method. A postmark does not establish timely receipt.
The initial term will be one year from the effective date. The City may renew the contract for up to two additional one-year periods by written agreement.
Responsive proposals meeting the required minimum qualifications will be evaluated using the following 100-point matrix.
| Criterion | Points |
| --- | --- |
| Relevant company experience and past performance | 25 |
| Key personnel, available crews, equipment, and capacity | 20 |
| Organization, management, and safety | 10 |
| Project approach and emergency response | 20 |
| Price | 25 |
| Total | 100 |
Performance and payment bonds shall be furnished when required by Georgia law and may be required when expressly stated in a Task Order. The selected Contractor shall maintain the insurance stated in Attachment D throughout the contract and each Task Order.