Community Development Office Remodeling Project

Active GOLDENVALLEYMN-152 RFQConstruction - BuildingCity of Golden Valley
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

City of Golden Valley (Minnesota) posted this RFQ on Oct 22, 2026. Responses are due Nov 24, 2026. Category: Construction - Building. Solicitation number GOLDENVALLEYMN-152.

Solicitation details

General information

Solicitation number
GOLDENVALLEYMN-152
Notice type
RFQ
Place of performance
Minnesota

Agency and category

Agency
City of Golden Valley
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Golden Valley is soliciting quotes for the Community Development Office Remodel Project.

The Work shall include furnishing all labor, tools, and equipment to construct new office space in accordance with the specifications herein. Location is Golden Valley City Hall, 7800 Golden Valley Road.

Scope

The Work shall include furnishing all labor, tools, and equipment to construct new office space in accordance with the specifications herein. The Work shall include the following:

  • Wall Construction – Contractor shall remove and install walls as indicated in Exhibit C. New walls between office and corridor wall shall be fire rated to match existing corridor wall fire rating. Walls shall be insulated to provide sound proofing. Contractor shall be responsible for mudding and sanding wall to a smooth surface ready for paint.
  • Office Doors – Contractor shall supply and install office doors. Contractor shall be responsible for staining to match existing doors. City shall approve purchase of office doors before purchase is made. City shall be responsible for hardware including locks.
  • Ceiling – Contractor shall remove and install ceiling grid and tiles as indicated in Exhibit C.
  • Electrical – The City shall hire third party contractor for electrical work. Contractor shall work with City on scheduling electrical work to ensure no delays.
  • HVAC – City shall hire third party contractor for HVAC work. Contractor shall work with City on scheduling HVAC work to ensure no delays.
  • Fire Suppression – The City shall hire third party contractor for fire suppression. Contractor shall work with City on scheduling fire suppression work to ensure no delays.
  • Paint – The City shall hire third party contractor for painting. Contractor shall work with City on scheduling painting to ensure no delays.
  • Flooring - The City shall hire third party contractor for flooring. Contractor shall work with City on scheduling flooring to ensure no delays. Contractor shall remove existing flooring as required for the removal and installation of walls.

Additional information

**Quotes due:** Tuesday, November 24, 2026, at 10:00 AM.

**Site Visit:** Tuesday, November 10, 2026, at 10:00 AM.

The Work shall commence on December 14, 2026, and conclude before January 29, 2027.

In consideration of the performance of the Work, the City shall pay to Contractor the amount set forth in the attached *Exhibit D*, in a total not to exceed amount of **$9,300.00** (the “Contract Price”).

Contractor shall maintain at a minimum:

  • Worker’s Compensation Insurance as required by Minnesota Statutes, section 176.181;
  • Business Auto Liability [...] with policy limits not less than $1,000,000.00 per accident [...];
  • Commercial General Liability in an amount of not less than $1,000,000.00 per occurrence, $2,000,000 general aggregate, and $2,000,000 for products-completed operations hazard.

Work shall occur Monday through Friday from 7:00 a.m. to 4:00 p.m., excluding holidays.

Proposals are good for 60 days. The City of Golden Valley reserves the right to reject any and all proposals.

Documents

2 files

Sign up free to get these 2 documents.

  • Cover Page-Bid Form_CD Remodel.pdf
    Download
  • CONTRACT FOR OFFICE REMODEL_CD.pdf
    Download

Similar open bids

In Minnesota

More from City of Golden Valley

Open bids