Fresh Air Unit for Building 949

Active 26-207 IFBConstruction - BuildingCity of Lincoln
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

City of Lincoln (Nebraska) posted this IFB on Oct 30, 2026. Responses are due Nov 13, 2026. Category: Construction - Building. Solicitation number 26-207.

Solicitation details

General information

Solicitation number
26-207
Notice type
IFB
Place of performance
Nebraska

Agency and category

Agency
City of Lincoln
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

This section describes the general requirements of these specifications and shall apply to all phases of the work indicated or required to provide for complete installation of all systems for this project.

This Section includes basic materials and methods to complement other Division 23 Sections.

Scope

Division 23 - Heating, Ventilating, and Air-Conditioning (HVAC) and Division 26 - Electrical specifications are included, covering the following sections:

  • Common Requirements for HVAC
  • Meters and Gages for HVAC Piping
  • General-Duty Valves for HVAC Piping
  • Identification for HVAC Piping and Equipment
  • Testing, Adjusting, and Balancing for HVAC and Plumbing
  • Duct Insulation
  • HVAC Piping Insulation
  • Instrumentation and Control Devices for HVAC
  • Building Management-Direct-Digital Control System
  • Hydronic Piping
  • Hydronic Specialties
  • HVAC Ducts and Casings
  • Air Duct Accessories
  • Water-Source Unitary Heat Pumps
  • Common Requirements for Electrical
  • Low-Voltage Electrical Power Conductors and Cables
  • Grounding and Bonding
  • Hangers and Supports
  • Conduit
  • Boxes
  • Identification for Electrical Systems
  • Panelboards
  • Fuses

Provide: Furnish, install, connect and tested complete and ready for use.

Furnish: Supply and deliver to the site ready for installation.

Install: Install complete, per Contract Documents and manufacturer's requirements.

Additional information

**Warranty:** Warrant all materials, workmanship and equipment against defects for a period of one year after the date of substantial completion.

**Questions:** If questions arise during the bidding process regarding the meaning of any portion of the contract documents, the prospective bidder shall submit the questions to the *Architect* for clarification. Any definitive interpretation or clarification of the contract documents will be published by addenda, properly issued to each person holding documents, prior to the bid date.

**Bonds:** A performance and payment bond in the full amount of the contract shall be required for all construction contracts. These bonds shall remain in effect during the guarantee period as stated in the specifications.

**Training:** A minimum of 4 hours, per system, of training shall be provided.

**Permits:** All permits, licenses, inspections and arrangements required for the work shall be obtained by the Contractor at his expense.

The Contractor has submitted to the City a sealed Proposal/Supplier Response, and the City will determine the lowest responsible bidder.

Documents

12 files

Sign up free to get these 12 documents.

  • Bid Invitation.pdf
    Download
  • Empl_Class_Act_EO.pdf
    Download
  • Contract - City Const.pdf
    Download
  • SPECS 2026-09-30 (COMBINED DELIVERABLE).pdf
    Download
  • SubmissionReceipt-ContractualInsuranceDeterminationForm-701.pdf
    Download
  • Instructions to Bidders 11-2023.pdf
    Download
  • Summary of Foreign Adversary Contracting Prohibition Act.pdf
    Download
  • United States Citizenship Attestation Form.pdf
    Download
  • Foreign Adversary Contracting Prohibition Act Certification Form.pdf
    Download
  • Empl_Class_Act_Aff.pdf
    Download
  • Contractual Insurance Result Guide.pdf
    Download
  • Drawings.pdf
    Download

Similar open bids

In Nebraska

More from City of Lincoln

Open bids