State of NC - Construction Office (North Carolina) posted this RFQu on Nov 2, 2026. Responses are due Nov 30, 2026. Category: Architecture & Engineering. Solicitation number SCO-NCSD-Campus Roof Repairs (11-2026).
Campus Roof Repairs
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Repair or replace roofs for Eight (8) campus buildings at the North Carolina School for the Deaf in Morganton, NC to include Main Building, Crutchfield Hall, Hoey Building, Goodwin Center, Hoffmeyer Hall, Service Building, Underhill Gym, and McCord Building.
Repair or replace roofs for Eight (8) campus buildings at the North Carolina School for the Deaf in Morganton, NC to include Main Building, Crutchfield Hall, Hoey Building, Goodwin Center, Hoffmeyer Hall, Service Building, Underhill Gym, and McCord Building.
The existing roofs to be serviced are comprised of Slate Shingles on Historic Buildings, Ballasted TPO, Modified Bitumen, Built up Asphalt, and Fully Adhered TPO.
Submission
Proposing firms must submit **THREE (3) copies** of the Letter of Interest and **THREE (3) copies** of your current Standard Form 254 (SF 254) with the information package. **E-mail and Fax submittals will not be accepted.**
The submitted information package should not include any notebooks, binders, tab, clips, etc. The format should be 8-1/2" x 11" pages stapled in the upper left-hand corner. The Letter of Interest should not exceed ten (10) single-sided pages or five (5) double-sided pages plus the SF 254.
Licensing
In order to offer architectural, engineering, or landscape architectural services in response to this solicitation, the proposing firm must be properly licensed to practice Architecture, Engineering, or Landscape Architecture in the State of North Carolina.
Selection criteria
In selecting designers, the selection committee should take into consideration qualification information including such factors as:
1. Specialized or appropriate expertise in the type of project.
2. Past performance on similar projects.
3. Adequate staff and proposed design or consultant team for the project.
4. Current workload and State projects awarded.
5. Proposed design approach for the project including design team and consultants.
6. Recent experience with project costs and schedules.
7. Construction administration capabilities.
8. Proximity to and familiarity with the area where the project is located.
9. Record of successfully completed projects without major legal or technical problems.
10. Other factors which may be appropriate for the project.
Budget
Total Project Budget: **$3,990,000**