Virginia Community College System (Virginia) posted this IFB on Oct 13, 2026. Responses are due Nov 12, 2026. Category: Construction - Building. Solicitation number 129825.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Sealed bids are invited for the construction of the Replace Grayson Hall Elevator and Loading Dock project at Wytheville Community College, Project Code # 260-B5260-075 (M25WC153) located in Wytheville, Virginia.
The project is generally described as an elevator replacement and loading dock leveler installation at Grayson Hall.
Sealed bids will be received **electronically through eVA** or at Virginia Community College System, Attention: Mrs. Sibyl Roberts, 300 Arboretum Place, Suite 200, Richmond, Virginia 23236. PLEASE NOTE: For shipping/mailing, use Suite 390; for hand delivery, use Suite 200.
The deadline for submitting bids is **2:00 P.M. sharp**, as determined by the Bid Officer, on **Thursday, November 12, 2026**. The bids will be opened publicly and read aloud beginning at 2:00 P.M., on the following day, Friday, November 13, 2026, at the same location.
Bids may be modified as per the Instructions to Bidders using fax number (804) 819-4762 and copying sroberts@vccs.edu.
A Standard Commonwealth Bid Bond is **required** (form *CO-10.2*) and Contract Security is **required** for any bid regardless of the bid amount.
**eVA Vendor Registration:** The bidder or offeror shall be a registered vendor in eVA.
**e-Builder:** Contractor shall process all Pay Applications / Invoices through the Owner's web-based project management software, e-Builder. There is no fee to use e-Builder.