City of Norfolk (Virginia) posted this IFB on Oct 15, 2026. Responses are due Dec 14, 2026. Category: Construction - Heavy & Civil. Solicitation number 19263.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The St. Paul's Blue-Greenway Stormwater Phase includes daylighting of approximately 1,200 linear feet of existing box culvert, excavation, active-flow management, deep foundations, retaining structures, a pedestrian bridge, drainage work, erosion and sediment controls, and restoration.
The St. Paul's Blue-Greenway Stormwater Phase includes daylighting of approximately 1,200 linear feet of existing box culvert, excavation, active-flow management, deep foundations, retaining structures, a pedestrian bridge, drainage work, erosion and sediment controls, and restoration.