Advertisement for Bids – Fletcher Avenue Extension – West

Active TONTITOWN-22ABA5E8 IFBConstruction - Heavy & CivilCity of Tontitown
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

City of Tontitown (Arkansas) posted this IFB on Oct 22, 2026. Responses are due Dec 1, 2026. Category: Construction - Heavy & Civil. Solicitation number TONTITOWN-22ABA5E8.

Solicitation details

General information

Solicitation number
TONTITOWN-22ABA5E8
Notice type
IFB
Place of performance
Arkansas

Agency and category

Agency
City of Tontitown
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

City of Tontitown, Arkansas (Owner) is requesting Bids for the construction of the following Project:

Fletcher Avenue Extension – West, T-2024-110

Completion of the Fletcher Avenue collector roadway between the existing Barrington Road intersection and Klenc Road. A portion of Fletcher Avenue has already been constructed; this Project constructs the remaining approximately 1,336 linear feet, from STA 12+40 to STA 25+76, westward to Klenc Road, together with half-street improvements along Klenc Road. The half-street improvements along Klenc Road are included in this Project as Deductive Alternate No. 1.

Scope

The Work includes site preparation, clearing and grubbing; roadway excavation, embankment, undercut, and engineered subgrade; storm drainage piping, flared end sections, cast-in-place drop inlets, and a headwall with safety rail; water main, valves, fire hydrants, steel encasement, and service tie-overs; aggregate base course and asphalt paving; concrete curb and gutter, sidewalk, multi-use trail, driveways, and ADA ramps; barbed wire, welded pipe, and wooden privacy fencing; erosion and sediment control; trench safety; pavement markings and signing; street trees; and traffic control.

This Contract includes one alternate, Deductive Alternate No. 1 (Klenc Road half-street improvements), and it is deductive. The Klenc Road half-street improvements are included in the Total Base Bid, and every Bidder must price every item of that Work on the Bid Schedule. Bidder must also state the amount to be deducted from the Total Base Bid if the Owner elects not to award that Work.

Additional information

Bids for the construction of the Project will be received at the City Hall located at 235 E Henri de Tonti Blvd, Tontitown, Arkansas 72762, until **Tuesday, December 1, 2026 at 2:00 p.m. local time**. At that time the Bids received will be publicly opened and read.

A **MANDATORY** pre-bid conference for the Project will be held on Tuesday, November 10, 2026 at 10:00 a.m. Bids will not be accepted from Bidders that do not attend the mandatory pre-bid conference.

Bid security in the amount of **five percent (5%)** of the total Base Bid, in the form of a cashier’s check or a bid bond issued by a corporate surety authorized to do business in Arkansas, must accompany each Bid as required by Ark. Code Ann. § 22-9-203. A Bid submitted without Bid security is void.

Performance and payment bonds, each in a sum equal to the Contract Price, will be required of the Successful Bidder in accordance with Ark. Code Ann. § 18-44-503.

Each Bidder must hold, before submitting its Bid, a current Arkansas Contractors Licensing Board license of the proper classification for the work bid, as required by Ark. Code Ann. § 17-25-313, and must enter its license number on the Bid Form.

The Contract Time for the Base Bid, which includes Deductive Alternate No. 1, is 180 calendar days to Substantial Completion and 210 calendar days to final completion. If Deductive Alternate No. 1 is deducted, the Contract Time is 150 calendar days to Substantial Completion and 180 calendar days to final completion.

The Owner reserves the right to reject any or all Bids and to waive any formalities.

Documents

1 file

Sign up free to get this document.

  • Advertisement for Bids – Fletcher Avenue Extension.pdf
    Download

Similar open bids

In Arkansas