Engineering (California) posted this IFB on Oct 13, 2026. Responses are due Nov 9, 2026. Category: Construction - Heavy & Civil. Solicitation number BID 23-16.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
This project involves the fabrication and installation of two aluminum flat covers over two existing 100-foot primary clarifiers to enhance odor control.
Core activities include demolition of existing launder covers, demolition of existing clarifier walkways, installation of new flat covers over the full surface area of each clarifier, installation of new launder covers, ducting tie-ins to an existing odor control system, and completion of all required electrical, structural, and mechanical modifications.
Emphasis will be placed on maintaining uninterrupted wastewater treatment activities with a high standard of safety throughout all phases of the work.
The work shall be diligently prosecuted to completion before the expiration of **250 working days**.