City of Norwich (Connecticut) posted this ITB on Oct 29, 2026. Responses are due Nov 13, 2026. Category: Construction - Building. Solicitation number 27-40.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
This project is being funded through the Property Rehabilitation Program and, or HUD Lead Based Paint Hazard Control in Priority Housing Program. Contractors must be aware that the City of Norwich is an Equal Opportunity Employer.
Bids are being sought for the project for the property located at: The residence at 9 Dupont Lane Norwich, Connecticut.
Bid: Roofing
Roof Replacement
The existing roof shingles are in poor condition. Remove all material to base substrate (Entire shingled roof and any over-hangs, porches, or outcroppings) Install a 15lb rolled roofing felt (all surfaces) and a "water and ice product" along all horizontal perimeters, at all transitions, and jogs. Include all new aluminum drip edge, pipe boots/sleeves as required.
Install new asphalt based roofing shingles with a minimum 30 year warranty. (Owner to select color and either a 3 tab or architectural style product.)
The existing chimney flashing may be used provided it is in sound condition and can effectively incorporate into the new installation.
Note: Include any flat roofs or portions of roof surfaces that may require a matching rolled asphalt product based on pitch. Contractor to check with the local building department for verification of product requirement. If the existing pitch requires a rolled asphalt product on any surface, the contractor is to match the new shingle color as closely as possible.
Decking- There is no consistent decking material on the existing roof as the original construction was slats. 1/2" plywood will be required for the [...]
All bids are to be submitted via the City of Norwich Procurement Portal. Proposals will not be accepted by mail, in person or by email.
All forms and associated documents must be uploaded through the procurement portal.
No Bidder may withdraw its bid within sixty (60) days of the bid opening date.
The firm whose proposal is accepted will be issued a "Notice of Award." The Vendor will be required to execute the "Notice of Award," and provide a certificate of insurance [...] within ten working days from the date the Notice of Award is issued.
The firm(s) will also be required to furnish all performance and payment bonds to the City prior to contract signing.
This project is allotted 10, calendar days to complete the specified scope from notice to proceed, baring weather and other excusable delays.
A pre-bid conference will be held on November 6, 2026 at 10:00 A.M. at the project location. Your attendance at that meeting is recommended to bid on this project.