Delaware Office of Management and Budget (Delaware) posted this ITB on Oct 21, 2026. Responses are due Nov 23, 2026. Category: Construction - Heavy & Civil. Solicitation number OMB-MC1002001330.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The project generally consists of the complete demolition and removal of nine (9) existing buildings at the former Plummer Community Corrections Center, including all associated building foundations, footings, concrete slabs, and below-grade building construction.
All demolition debris shall be removed from the site and disposed of in accordance with applicable regulations. Existing site utilities shall be disconnected, cut, and permanently capped at or immediately adjacent to each building. Existing site utility distribution systems shall remain in place.
All existing site improvements, including asphalt paving, roadways, parking areas, sidewalks, curbing, and perimeter fencing, shall remain and be protected throughout demolition activities. Following demolition, building excavations shall be backfilled and rough graded to provide safe, stable, and properly draining conditions.
Comprehensive site grading, paving replacement, landscaping, and site redevelopment are not included in the project scope. Hazardous and regulated material abatement will be completed by others prior to demolition.