Hangars 1 and 2 Roof Replacement

Active OpenGov-4e3fafe9 ITBConstruction - BuildingCity of Lake City
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

City of Lake City (Florida) posted this ITB on Oct 28, 2026. Responses are due Nov 19, 2026. Category: Construction - Building. Solicitation number OpenGov-4e3fafe9.

Solicitation details

General information

Solicitation number
OpenGov-4e3fafe9
Notice type
ITB
Place of performance
Florida

Agency and category

Agency
City of Lake City
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Project generally consists of the replacement of existing roof systems with new metal roofing system, gutters, downspouts and purlins for the Lake City Gateway Airport Hangars 1 and 2, and as further defined by the contract documents.

Owner: City of Lake City.

Sealed bids will be accepted by the City of Lake City, Florida [...] for the replacement of the existing roofing systems (roof panels and substructure) on: Hangars 1 and 2 Roof Replacement

Scope

The Project generally consists of the replacement of existing roof systems with new metal roofing system, gutters, downspouts and purlins for the Lake City Gateway Airport Hangars 1 and 2, and as further defined by the contract documents.

Contract Type: A single prime contract based on a Stipulated Price, with adjustments for Work performed under unit prices as specified in Section 01 22 00 - Unit Prices.

Owner's tenant will occupy the Hangars and conduct aircraft maintenance operations during the entire construction period, except during Building Shutdown Periods coordinated with Owner. Schedule the Work to accommodate tenant's occupancy.

Remove only as much existing roofing as can be made weathertight the same day. Provide temporary protection for tenant's aircraft, equipment, and building contents from weather and falling debris throughout construction.

Unit Price No. 1 - Purlin Replacement

Removal (and temporary bracing and protection of adjacent construction during replacement) of deteriorated existing roof purlins and replacement with new purlins as indicated on Drawings, including laps, clips, connections, fasteners, bracing, and disposal of removed material. Unit of Measurement: Linear foot, measured between centerlines of supporting primary frames.

Alternate No. 1 - Accelerated Building Shutdown

Complete the Work with a maximum Building Shutdown Period of 60 consecutive calendar days for the entire project. Include all costs for premium time, additional crews, extended work hours, weekend work, expedited material procurement, and resequencing required to meet this duration.

Control Foreign Object Debris (FOD) on site at all times. Comply with airport security, badging, escort and airside access requirements established by Owner.

Additional information

Sealed bids will be accepted through the City's e-Procurement Portal, OpenGov Procurement. **Bids will not be accepted through any other means.** Bid opening will be promptly at **2:15 PM** in the City Council Chambers located on the 2nd floor in City Hall, at which time all bids will be publicly opened and read aloud.

Any deviation from the specifications must be explained in detail under "Clarifications and Exceptions", as part of the Bidder's Response.

All questions related to this ITB shall be submitted in writing through the OpenGov Procurement Question/Answer Tab via the City's e-Procurement portal.

Contract Type: A single prime contract based on a Stipulated Price, with adjustments for Work performed under unit prices. Alternates quoted on Bid Forms will be reviewed and accepted or rejected at Owner's option. Submit, with the bid, a preliminary schedule showing how the Building Shutdown Period will be met.

Owner will consider requests for substitutions only if submitted at least 10 days prior to the date for receipt of bids.

Prior to submitting bids, the contractor shall visit the job site to familiarize themselves with existing conditions.

Documents

6 files

Sign up free to get these 6 documents.

  • Hangars_1_&_2_Roof_Technical_Specifications.pdf
    Download
  • LCQ_AAR_Hangars_1_&_2_Price_Form.docx
    Download
  • LCQ_AAR_Hangars_1_&_2_BID_DOCUMENTS.docx
    Download
  • 2026-10-21_Hangar_#1_&_2_-_Roof_Replacement_Bid_Set.pdf
    Download
  • General_Provisions.pdf
    Download
  • Hangars_1_and_2_Roof_Replacement.pdf
    Download

Similar open bids

In Florida

More from City of Lake City

Open bids