Active ITB-E 2027-015 ITBUtilities & EnergyGainesville Regional Utilities
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Gainesville Regional Utilities (Florida) posted this ITB on Nov 2, 2026. Responses are due Dec 8, 2026. Category: Utilities & Energy. Questions are due 2026-11-24 16:00. Solicitation number ITB-E 2027-015.

Solicitation details

General information

Solicitation number
ITB-E 2027-015
Notice type
ITB
Place of performance
Florida
Questions due
2026-11-24 16:00

Agency and category

Agency
Gainesville Regional Utilities
Category
018Utilities & Energy
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Gainesville Regional Utilities (GRU) is seeking to procure Single Phase Pad Mount Transformers.

The Contractor shall supply and deliver single phase pad mount transformers to Gainesville Regional Utilities (GRU) on an as-needed basis throughout the contract term. All transformers furnished under this contract shall comply with GRU’s approved standards for its Electric Distribution System and the applicable technical specifications included with the solicitation.

Scope

GRU will only accept bids for conventional pole-mounted transformers and single-phase pad-mounted transformers manufactured in North America. The transformer core must also be manufactured in North America.

Bids that include products from multiple manufacturers shall be deemed non-responsive.

All transformers supplied under this contract shall meet the applicable technical specifications, performance requirements, and approved standards established by GRU.

Following contract award, the Contractor shall submit complete approval drawings for all transformers to be supplied under the Contract. All drawings shall be reviewed and approved in writing by GRU prior to commencement of fabrication. The Contractor shall not begin fabrication until such approval has been obtained.

At the time of delivery, the Contractor shall provide certified test reports for all transformers included in each order. The reports shall identify each transformer by its applicable serial number or other unique identifier and include the actual measured or tested loss data for each individual unit delivered.

The quoted no-load losses, load losses, and total losses shall represent the guaranteed average values for all transformers included in a given order. Notwithstanding the guaranteed average values, no individual transformer shall exceed the following maximum tolerances:

  • No-Load Losses: The measured no-load losses of any individual transformer shall not exceed the quoted no-load losses by more than ten percent (10%).
  • Total Losses: The measured total losses of any individual transformer shall not exceed the quoted total losses by more than six percent (6%).

Bidders shall provide pricing that includes all applicable tariffs, duties, surcharges, fees, and other costs associated with the manufacture, sale, and delivery of the transformers. All such costs shall be separately identified and itemized in the bid submission.

Additional information

Bids shall be submitted online on the OpenGov website prior to the closing date and time. OpenGov can be accessed by the following: https://produrement.opengov.com/signup

Bids may be received up to but no later than **2:00 pm on Tuesday, December 8, 2026** via GRU e-Procurement Portal located at https://procurement.opengov.com/portal/GRU. GRU e-Procurement Portal Clock is the official clock for the determination of all deadline dates and times.

The *Respondent’s Certification Form* must be submitted with the Response. If required, a Bid Bond and other documents must be provided with the Response.

**BID BOND REQUIRED:** TBD

Award will be made to the best evaluated Respondent(s) for Response(s) based on price, understanding the approach, company's process qualifications and experience, lead time, warranty, and references for each individual line item, or any combination of line items, as GRU determines to be in its best interest.

The term of this Contract shall commence on the December 1, 2026 and terminate on November 31, 2029.

Upon mutual agreement between Parties, this contract may be renewed for one (1) two-year renewal additional years.