SW-2 Bypass Pumping & Rehabilitation (Project No. 25-11070A)

Active OpenGov-7040332b IFBConstruction - Heavy & CivilCity of Hollywood
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

City of Hollywood (Florida) posted this IFB on Oct 20, 2026. Responses are due Nov 25, 2026. Category: Construction - Heavy & Civil. Solicitation number OpenGov-7040332b.

Solicitation details

General information

Solicitation number
OpenGov-7040332b
Notice type
IFB
Place of performance
Florida

Agency and category

Agency
City of Hollywood
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Hollywood Department of Public Utilities is seeking qualified contractors for the Stormwater Pump Station No. 2 (SW-2) Bypass Pumping & Rehabilitation project (Project No. 25-11070) located along South 8th Avenue and North Southlake Drive. The primary objective of this project is to execute comprehensive structural rehabilitation, pump well modifications, and site infrastructure upgrades to modernize and restore full operational performance to the SW-2 stormwater pumping facility.

Scope

To maintain essential uninterrupted stormwater service during construction, Phase 1 requires the contractor to establish and operate a fully automated, 20,000 GPM bypass pumping system utilizing MWI hydraulic pumps, temporary discharge piping over the seawall, concrete equipment pads, and security fencing. Once the bypass system is proven operational for one week, Phase 2 structural rehabilitation will commence. Scope for this phase includes demolition of existing pump well top slabs and apparatus, pouring a new reinforced concrete top slab, executing localized CMU wall and concrete spall/crack structural repairs, and installing new pumping equipment and control drive units.

The final phase involves full site restoration, including removing all temporary bypass piping and equipment, restoring affected asphalt pavement, concrete sidewalks, and sodded areas, and ensuring all drainage structures and outfalls meet municipal standards.

Additional information

Qualified vendors with strong expertise in municipal utility infrastructure, temporary flow bypass management, and heavy structural concrete restoration are invited to submit bids.

Similar open bids

In Florida

More from City of Hollywood

Open bids