Chevy Chase Village (Maryland) posted this IFB on Oct 16, 2026. Responses are due Nov 13, 2026. Category: Landscaping & Agriculture. Questions are due 2026-10-22 14:00. Solicitation number BPM059072.

Solicitation details

General information

Solicitation number
BPM059072
Notice type
IFB
Place of performance
Maryland
Questions due
2026-10-22 14:00

Agency and category

Agency
Chevy Chase Village
Category
017Landscaping & Agriculture
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

This is an invitation to submit a Bid ("IFB") for the performance of construction and landscaping services for the Belmont Avenue Extended (Buffer) Drainage Project for Chevy Chase Village, located between Grove and Park Streets, which will include, but not be limited to, removal of existing drainage infrastructure, grading, installation of new piping and inlets, installation of plant material and mulching, and replacement of an irrigation system.

Chevy Chase Village (the "Village") is an incorporated municipality within Montgomery County, Maryland.

Scope

Chevy Chase Village intends to enter into a Unit Price Contract with a qualified firm to provide construction and construction-related services including but not limited to the construction, repair, retrofit, alteration and modernization for:

Chevy Chase Village: Buffer Area – Landscape and Storm Drain:

The project calls for the full renovation of the Chevy Chase Buffer area which borders Belmont Avenue, Center Street, Montgomery Street, Grove Street and Park Street. The existing area has become barren due to the overgrowth of canopy trees. Analysis shows that the existing storm drain system is inadequate to capture and convey stormwater runoff that enters the area. In order to remedy this the renovation includes the installation of a new storm drainage system, soil amendments, tree installation, landscaping, conveyance swales and a 4-inch wide trench drain inside the gutter at the Grove Street entrance.

Access to the project is near private properties, which must be restored in a manner sensitive to the abutting neighbors and surrounding community. Handling of stormwater flows through the work areas must be considered.

The Work is not considered complete until the Village Engineer and Village Staff have completed a punch list inspection and all identified punch list items addressed.

The Contractor shall ensure the quality of work by employing qualified, experienced personnel, trained in environmental restoration and sediment control measures. Contractor will provide all necessary management, supervision, personnel, labor, tools, materials, and equipment for each of the Lump Sum bids.

Additional information

Submission:** All bids must be submitted **electronically** to Ms. Parker at jacqueline.parker@montgomerycountymd.gov. Per Addendum 1, bid closing is extended to **Friday, November 13, 2026, at 2:00 p.m.** The bid opening will occur virtually at **2:30 p.m.

Bids will be evaluated using a predetermined method to ascertain which bidder best meets the needs of the Village. Evaluation considerations will include but not limited to the following:

  • Responsiveness of the bid in clearly stating the understanding of the work to be performed.
  • Technical experience of the bidder.
  • Favorable assessment of the bidder's services by other clients with similar needs.
  • Size and structure of the bidder to include amount of equipment and personnel available to be devoted to the Village.
  • Cost. Although a significant factor, cost may not be the dominant factor.

The successful bidder shall give a Performance and Labor and Materials Bond within ten business (10) days after the date of the award of the Contract, in the amount of **100%** of the Contract Price for both. A bid bond is not required.

A retainage of **5%** of the contract price is required for a period of four (4) months following completion of the contract.

Liquidated Damages of **$500.00** per calendar day for each day that the work exceeds the Contract Term may be charged.

The dates of work for the contract will be February 15, 2027, through May 17, 2027.

Documents

4 files

Sign up free to get these 4 documents.

  • CCV_Buffer_Bid_Sheet_UPDATED_101626.xls
    Download
  • Addendum_1_-_Buffer_Drainage_Project_10162026.pdf
    Download
  • CCV_Buffer_Bid_Sheet_FINAL092526.xls
    Download
  • Chevy_Chase_Village_IFB_for_Belmont_Ave_Extended-Buffer-Drainage_Project.pdf
    Download

Similar open bids

In Maryland