Los Alamos County Transit Bus EV Chargers and Bus Canopy Drain

Active IFB27-09 IFBConstruction - BuildingLos Alamos County
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Los Alamos County (New Mexico) posted this IFB on Oct 25, 2026. Responses are due Nov 17, 2026. Category: Construction - Building. Questions are due At least six (6) business days prior to the submission due date. Solicitation number IFB27-09.

Solicitation details

General information

Solicitation number
IFB27-09
Notice type
IFB
Place of performance
New Mexico
Questions due
At least six (6) business days prior to the submission due date

Agency and category

Agency
Los Alamos County
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Incorporated County of Los Alamos is requesting bids to install Electric Vehicle charging infrastructure for two buses and a drain management system at its bus parking lot canopy structure.

This Procurement includes installation of County furnished equipment consisting of: Two (2) ChargePoint Express Plus Level 3 Direct Current Fast Chargers and one (1) A new 500 KVA utility XFMR 480V/3 Ph Sec as further described herein.

The Electric Vehicle charging infrastructure consists of the installation of two (2) County-furnished ChargePoint Express Plus Level 3 Direct Current Fast Chargers (EV-DCFC) and ancillary electric service.

The drain management system consists of two parts: i) an ice melting system with ancillary electric service, gutters, and downspouts at the bus canopy. ii) underground piping to collect drain water and direct it to the storm water sewer.

Scope

Contractor shall furnish all labor, materials, equipment, tools, and professional services required to successfully execute and complete both project components.

EV Charging Infrastructure Installation

  • Station Installation: Install and anchor the two (2) new commercial-grade ChargePoint Express Plus Level 3 DC Fast Charging stations.
  • Electrical Distribution: Execute all downstream electrical distribution from the meter, including trenching, conduit placement, and wiring.
  • Civil & Structural Work: Pour specialized structural concrete pads for charging hardware and install protective bollards to prevent vehicle impact.
  • Utility Relocation: Safely disconnect, move, and reinstall existing block heaters to accommodate the new layout.

Bus Canopy Drainage & Deicing Management

  • Drainage Systems: Install commercial-grade drainage management infrastructure for the main bus canopy.
  • Thermal Protection: Install and wire a dedicated roof deicing system along the upper roof/canopy surfaces to manage ice buildup.

Civil Work & Restoration

  • Concrete Reconstruction: Reconstruct surrounding concrete sidewalks, curbs, and gutters to match and seamlessly support the modified site layout.
  • Pavement Markings: Apply professional-grade pavement striping and markings for the designated EV charging stalls.
  • Site Preparation: Perform all necessary clearing, grubbing, and complete removal of obstructive materials within designated work zones.

Project Management, Safety, & Controls

  • Mobilization: Mobilize all personnel, machinery, and equipment to the Pajarito Cliffs site.
  • Traffic Control: Design, implement, and maintain comprehensive traffic control management, utilizing appropriate construction traffic control devices to guarantee safe vehicle and pedestrian movement throughout the construction phase.
  • Utility Line Locates: Initiate utility line locates requests via the NM811 process to identify all existing subsurface utilities prior to excavation.
  • Agency Coordination: Coordinate directly with the Los Alamos County Department of Public Utilities (DPU) for mandatory open-trench and pothole inspections before any conduit placement.
  • Engineering Controls: Provide all professional construction staking and engineering layout controls necessary to execute the civil designs according to approved site plans.

Additional information

**Electronic submissions only.** Only Bids submitted through the County's Procurement Portal by the Bid Due Date stated herein, or as may be modified by addendum, will be considered. Late responses will not be considered. Only Bids received through the Procurement Portal prior to **2:00 p.m. MDT, November 17, 2026** will be reviewed.

Bid security in the amount of **five percent (5%) of the bid** must accompany the bid.

The evaluation criteria for this Bid are:

1. Accurate submission of Bid Response Documents
2. Cost

**Bid Separation (Mandatory).** Respondents must present a single, unified bid. However, costs for the EV-DCFC infrastructure and the drain management system must be clearly separated and itemized to facilitate precise expense tracking and grant reporting.

**State pre-qualification (Mandatory).** The bidding Contractor must possess and maintain active NMDOT 18.27.5 NMAC pre-qualification status.

The successful Bidder, upon failure or refusal to execute and deliver the Contract and required Bonds within ten (10) calendar days after Bidder has received the Notice of Award, shall forfeit the Bidder's Bond to the County.

Documents

12 files

Sign up free to get these 12 documents.

  • Acknowledgement of Addenda.pdf
    Download
  • BUY AMERICA CERTIFICATION revised for BABA.pdf
    Download
  • IFB - Authorization for Verification of Information.pdf
    Download
  • IFB - Bid Bond.pdf
    Download
  • IFB - Campaign Contribution Form.pdf
    Download
  • IFB - Certification Regarding Debarment Suspension Form.pdf
    Download
  • IFB - Copy of Bidders State of NM Contractors License(s).pdf
    Download
  • IFB - List of Subcontractors.pdf
    Download
  • IFB - Permanent Main Office Address of Company.pdf
    Download
  • IFB Request for Preference Form.pdf
    Download
  • IFB27-09 Transit Bus EV Chargers and Bus Canopy Drain Project FINAL 20261021.pdf
    Download
  • Lobbying Certification.pdf
    Download

Similar open bids

In New Mexico

More from Los Alamos County

Open bids