Skanska E-J Rockaway WRRF Joint Venture (New York) posted this RFQ on Oct 13, 2026. Responses are due Nov 20, 2026. Category: Construction - Heavy & Civil. Solicitation number 2139781.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Skanska E-J Rockaway WRRF Joint Venture is soliciting cost proposals from New York DBE subcontractors/vendors for the Contract R156-RO2-DB Upgrade of the Main Sewage Pump and Power Distribution Systems at the Rockaway Wastewater Resource Recovery Facility which bids on **November 20, 2026**.
Contractor to complete the upgrade and replacement of the facility's Main Sewage Pump (MSP) and Power Distribution Systems.
Major work includes replacing existing drywell and submersible sewage pumps, force mains, valves, flow metering, associated mechanical systems, and odor control systems; demolishing obsolete pumping equipment; and installing interim pumping systems to maintain uninterrupted plant operations throughout construction.
The project also includes replacing the electrical infrastructure, including substations, switchgear, motor control centers, standby generators, instrumentation and controls, SCADA integration, HVAC, architectural and structural modifications, civil site improvements, and public address systems.
Disadvantaged Business Enterprise contracting goals (DBE)
DBE Goal: 20.00%