Town of Apex (North Carolina) posted this RFQu on Oct 2, 2026. Responses are due Nov 19, 2026. Category: Architecture & Engineering. Questions are due 2026-11-06 16:00. Solicitation number 1015TOAWRFUV001.
Town of Apex (Town) requests Statements of Qualifications (SOQs) from qualified engineering firms or consultant teams licensed to provide professional engineering services in North Carolina for replacement of the ultraviolet (UV) disinfection system at the Apex Water Reclamation Facility (WRF). Anticipated services include preliminary engineering, competitive UV equipment preselection, final design, permitting, bidding assistance, construction administration and observation, startup, and project closeout.
The Town intends to select one Consultant for the overall project. Services may be authorized in phases, and the Town reserves the right to contract separately for portions of the work. Final scope, schedule, deliverables, and compensation will be established during contract negotiations.
Pre-Submittal Conference and Site Visit (non-mandatory)
Thursday, October 22, 2026 at 9:00 a.m. ET
Pre-Submittal Conference
Water Resources Administration Building
105-B Upchurch St, Apex, NC 27502
Site Visit to Follow
Apex Water Reclamation Facility
300 Pristine Water Drive, Apex, NC 27539
Deadline to submit written questions
Friday, November 6, 2026 by **4:00 p.m. ET**
Statement of Qualifications Due
Thursday, November 19, 2026 by **2:00 p.m. ET**
Direct all inquiries concerning this RFQ to:
Chandler Bailey, PE Utilities Engineer chandler.bailey@apexnc.org
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Town of Apex (Town) requests Statements of Qualifications (SOQs) from qualified engineering firms or consultant teams licensed to provide professional engineering services in North Carolina for replacement of the ultraviolet (UV) disinfection system at the Apex Water Reclamation Facility (WRF). Anticipated services include preliminary engineering, competitive UV equipment preselection, final design, permitting, bidding assistance, construction administration and observation, startup, and project closeout.
The Town intends to select one Consultant for the overall project. Services may be authorized in phases, and the Town reserves the right to contract separately for portions of the work. Final scope, schedule, deliverables, and compensation will be established during contract negotiations.
The Town owns and operates the Apex WRF at 300 Pristine Water Drive, Apex, NC 27539. The facility has a rated capacity of 3.6 million gallons per day (mgd) and an average daily flow of approximately 1.1 mgd. The existing Trojan UV4000 disinfection system was installed in 1998 within the former chlorine contact basin.
The Town seeks a practical, cost-conscious approach that uses existing infrastructure where feasible, limits unnecessary studies, and advances efficiently from preliminary engineering through construction. [...] Detailed scope, deliverables, review milestones, and schedule will be established with the Consultant.
Respondents shall submit one PDF **by email** to Chandler Bailey at chandler.bailey@apexnc.org by the deadline in Section 2.1. No hard copy submission is required. Late SOQs will not be considered. The SOQ shall not exceed **20 pages**. The completed and signed *Execution of Statement of Qualifications* form from Section 7 is **required** as the final page.
SOQs will be evaluated by a selection committee of Town staff using the following criteria:
| Criterion | Weight |
| --- | --- |
| Team Qualifications and Experience | 40% |
| Project Approach | 30% |
| Project Understanding | 20% |
| Corporate Background and Experience | 10% |
| Total | 100% |
Do not include a proposed professional services fee or hourly rate schedule in the SOQ. Construction cost information for reference projects is **required**. The Town will negotiate scope, schedule, and a fair and reasonable fee with the highest-ranked respondent.
Sign up free to get these 6 documents.