RFSOQ for Electrical Support

Active OpenGov-64df26ef RFQuArchitecture & EngineeringTarrant Regional Water District
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Tarrant Regional Water District (Texas) posted this RFQu on Oct 12, 2026. Responses are due Nov 19, 2026. Category: Architecture & Engineering. Questions are due 2026-11-05. Solicitation number OpenGov-64df26ef.

Solicitation details

General information

Solicitation number
OpenGov-64df26ef
Notice type
RFQu
Place of performance
Texas
Questions due
2026-11-05

Agency and category

Agency
Tarrant Regional Water District
Category
007Architecture & Engineering
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

TRWD is hereby inviting Statements of Qualifications (SOQ) for RFSOQ for Electrical Support. Due to the indefinite nature of the need for services there is no guarantee of project assignment to the firms selected. Selected firms may be awarded one or more assignments as projects become available and based on the availability of the firm. Award of an IDIQ contract, or subsequent assignment under an IDIQ contract, will not disqualify a firm from responding to any future projects for which a project-specific RFSOQ may be issued.

TRWD hereby invites Statements of Qualifications (SOQ's) for electrical engineering support, owner's agent services, and electrical equipment acceptance testing.

Scope

TRWD hereby invites Statements of Qualifications (SOQ's) for electrical engineering support, owner's agent services, and electrical equipment acceptance testing. The Scope of Work in this section is not comprehensive. Rather, it represents what TRWD anticipates will be needed for these projects. Prospective firms may recommend improvements to the scope in the project approach section of their SOQ. The selected firm will prepare a comprehensive scope that will be negotiated with TRWD.

Category A- Electrical Engineering Support

1. Review other firm's electrical designs and provide comments
2. Review TRWD internal maintenance projects and provide comments and engineering designs
3. Provide preliminary and final design services on smaller CIP projects

Category B- Owner's Agent Services, Energy Audits, Energy Conservation Measures

1. Assist in contract negotiations for electrical related contracts, including negotiations with utilities and other firms or organizations
2. Provide analysis and recommendations to help TRWD make decisions on electrical related issues
3. Provide periodic legislative and tariff updates as they relate to TRWD's services
4. Conduct facility energy audits and analyze utility usage to identify energy-saving opportunities.
5. Evaluate lighting, HVAC, controls, and building envelope improvements to reduce energy consumption and operating costs.
6. Assess equipment operating schedules and building automation settings for low-cost operational efficiency measures.
7. Develop Energy Conservation Measures (ECMs) with estimated implementation costs, annual savings, and payback periods.

Category C- Electrical Equipment Acceptance Testing

1. Provide owner's acceptance and testing services for electrical equipment including medium voltage cables, transformers, switchgear, VFDs, MCCs, and other general electrical testing and settings coordination
2. IBC Special Inspections

Additional information

SOQs shall be submitted by **Thursday, November 19, 2026 at 2:00 pm CT** via **OpenGov Procurement Website**.

SOQs will be evaluated and ranked based upon the responses provided relative to the content requirements of this RFSOQ.

| No. | Evaluation Criteria | Weight (Points) |
| --- | --- | --- |
| 1 | Experience and qualifications of proposed personnel | 50 |
| 2 | Prior experience and past performance of Firm | 30 |
| 3 | Commitment of Staff and Schedule | 20 |

This contract, if a contract is awarded, will be in effect for **five (5) years** subject to agreement by both parties.

Do not provide any fee estimates, pricing or billing rate information as part of the SOQ submittal.

Documents

1 file

Sign up free to get this document.

  • RFSOQ_for_Electrical_Support.pdf
    Download

Similar open bids

In Texas

More from Tarrant Regional Water District

Open bids