The Texas A&M University System (Texas) posted this RFQu on Nov 3, 2026. Responses are due Dec 1, 2026. Category: Architecture & Engineering. Solicitation number TAMUS-RFQ-02-3487.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Texas A&M University System Office of Facilities Planning & Construction (FP&C), on behalf of the Board of Regents of The Texas A&M University System (Owner) and Texas A&M University, is soliciting statements of qualifications for selection of an Architect/Engineer (A/E) firm for the Domestic Water Well #6 Upgrade project at Texas A&M University (#02-3487) located in Bryan, Texas in accordance with the terms, conditions, and requirements set forth in this Request for Qualifications (RFQ).
Texas A&M University Facilities & Energy Services proposes the redrilling and replacement of existing Well #6, originally constructed in 1960. Well #6 is one of the University's highest-producing groundwater assets and is essential to meeting campus operational demand.
Performance testing confirmed the existing well is operating below its expected pump curve, indicating diminished hydraulic efficiency, while increased regional pumping stresses within the Simsboro Aquifer are expected to accelerate water-level declines near the well.
The project includes construction of a new 24-inch Simsboro replacement well designed to meet BVGCD, TCEQ, and TDLR requirements; installation of a 1,000-HP, 4,160-V vertical turbine pump; electrical upgrades including a new medium-voltage transformation package, switchgear, protective relays, conduit, and conductors; and a new emergency generator with load bank connection.
Additional work includes a reinforced pump pad, cooling tower, SCADA and communications integration, electrical improvements, and required civil/site work. Upon commissioning, the existing 1960 Well #6 will be plugged and abandoned or reclassified in accordance with BVGCD requirements.
The planning amount for the project is **$20,640,000**, which includes an Amount Available for Construction Contract (AACC) of **$17,389,893**. Fees, furnishings, other work, miscellaneous expenses, and contingencies make up the balance of the Planning Amount.
This RFQ is the first step in the process for selecting a firm. The RFQ provides the information necessary to prepare and submit Qualifications for consideration by the Owner. The Owner may select the top three (3) or more of the top ranked qualified respondents to present their qualifications during an interview.
**The RFQ package/documents must be accessed and responded to within e-Builder.** The following link provides access to the RFQ package/documents: https://tinyurl.com/5aytjcx2
FP&C will accept statement of qualification submissions uploaded to e-Builder until **2:00 p.m. CST, Tuesday, December 1, 2026**.
All addendums if any will be posted within this e-Builder site and not on this ESBD posting.
To assist respondents in completing the required State of Texas SP form, the office of Procurement & Business Services developed a brief tutorial addressing common errors and questions. Questions regarding completion of this form may be sent by email to so-hubprogram@tamus.edu.