AS27-126 Engineering Analysis for Newfoundland Basin Water Augmentation to GSL

Active AS27-126 RFSQArchitecture & EngineeringOffice of the Great Salt Lake Commissioner
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Office of the Great Salt Lake Commissioner (Utah) posted this RFSQ on Nov 4, 2026. Responses are due Nov 18, 2026. Category: Architecture & Engineering. Solicitation number AS27-126.

Solicitation details

General information

Solicitation number
AS27-126
Notice type
RFSQ
Place of performance
Utah

Agency and category

Agency
Office of the Great Salt Lake Commissioner
Category
007Architecture & Engineering
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Office of the Great Salt Lake Commissioner (“GSLCO”) is seeking Statements of Qualifications (SOQ) from qualified Engineering Consultants (“Consultant”) to provide an engineering analysis. This engineering analysis should investigate methods and infrastructure required to augment the Newfoundland Basin and efficiently deliver surface water from the basin to the Great Salt Lake ("GSL") to improve overall lake levels. This analysis should focus on methods to deliver surface water from the east and west portions of the Newfoundland basin to GSL.

Scope

**Phase One - Engineering Analysis:** This engineering analysis should address several management scenarios and consider the topography, sediments, heightened and variable water density, variable flows, remote location, scale of distances, evaporation and salt (halite) formation, and other various conditions preventing water from flowing to GSL or constraining the project. Wherever possible, the use of existing canals and other water conveyance infrastructure should be prioritized. Additionally, the engineering analysis should include cost estimates for maintenance requirements and long-term system management.

The Consultant must provide a minimum of three options to GSLCO with preliminary cost estimates and other considerations related to the strengths and weaknesses of each method analyzed. Options presented must account for applicable environmental review or regulatory processes.

**Phase Two - 30% Design:** Once GSLCO has selected a preferred method, the Consultant will develop the design (30%) and cost estimate to the extent funding allows.

The system needs to:

  • Be able to facilitate sustained and variable surface water conveyance from the Newfoundland Basin to the GSL.
  • Be adjustable in magnitude based on available basin supply and GSL delivery needs, focused on maximizing surface water inflows to GSL.
  • Be resilient and/or maintainable as it relates to potential clogging from debris, sediment infilling, salt formation, subsidence, and other dynamic impacts.
  • Function despite the extreme corrosiveness and encrustation associated with hypersaline brines that may be present in the basin.
  • Operate despite significant elevation changes and distance constraints between the basin and GSL.
  • Function without large operational cost, e.g., optimizing passive operation where possible.
  • Be engineered in a manner that directly facilitates flow monitoring or the application of a rating curve to a constructed stage within a reach.

The selected Consultant will be responsible for incorporating the collection, measurement, and evaluation of this data into their engineering analysis and the 30% design:

  • An accurate terrain elevation for the project site.
  • Surface and subsurface characteristics of the project site.
  • Improved estimates of annual volumetric retention within Newfoundland Basin.
  • An assessment of the variability of retained volumes over time.
  • What volume of water can reasonably be expected to reach Great Salt Lake through the implementation of this solution in an average year, if any.

**Deliverables:** The Consultant shall deliver a report that contains the final cost estimate and engineer drawings of the selected solution(s) to the extent funding allows for 30% or more design. The report should include all documents and analysis conducted throughout the contract, including the initial alternatives analysis, recommendations, cost estimates and conclusions. The report may be delivered in an electronic file format.

Additional information

**Executive Summary:** The Executive Summary is limited to two pages and should briefly describe the Consultant’s qualifications.

The SOQ shall not exceed **15 pages** in length, using a font no smaller than Times New Roman 12-pt. The Executive Summary will not count in the 15-page limit.

All Proposals received will be reviewed by an evaluation committee and scored according to the evaluation criteria. The criteria and each associated point value (**1000 points total**) are as follows:

  • Approach/Methodology (200 points possible)
  • Qualifications of Consultant, including any Subconsultants (250 points possible)
  • Demonstrated Knowledge (250 points possible)
  • Work Schedule (150 points possible)
  • Scheduling of Availability of Personnel (150 points possible)

Do NOT include pricing when you submit your qualifications.

All questions must be submitted through U3P during the question and answer period.

The limits of the CGL insurance policy will be no less than one million dollars ($1,000,000.00) per person per occurrence and three million dollars ($3,000,000.00) aggregate.

The State may reject a response if the vendor who submitted the response fails to sign a contract within 90 days after the contract award.

Documents

5 files

Sign up free to get these 5 documents.

  • AS27-126 Score Sheet - Informational Only.xls
    Download
  • Att.-A-PO-Terms-and-Conditions (25).docx
    Download
  • Attachment B Scope of Work.docx
    Download
  • Claim of Business Confidentiality Updated.pdf.pdf
    Download
  • Vendor Prerequisites - Part 15.pdf
    Download

Similar open bids

In Utah