11th Street Corridor Improvements Project

Active BREMERTONWA-218 RFQuArchitecture & EngineeringCity of Bremerton
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

City of Bremerton (Washington) posted this RFQu on Nov 3, 2026. Responses are due Dec 1, 2026. Category: Architecture & Engineering. Solicitation number BREMERTONWA-218.

Solicitation details

General information

Solicitation number
BREMERTONWA-218
Notice type
RFQu
Place of performance
Washington

Agency and category

Agency
City of Bremerton
Category
007Architecture & Engineering
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Bremerton, Public Works, Engineering Division (City), solicits interest from a qualified multidisciplinary consultant team with demonstrated experience in the design and delivery of a federally funded urban transportation improvement project. This agreement will be for approximately 12 months in duration with the option for the city to extend it for additional time and money if necessary.

Scope

The work performed by the CONSULTANT consists of preparing preliminary engineering (PE) design for 11th Street Corridor between Pacific Avenue and Kitsap Way. The corridor has 3 distinct segments as follows: Segment #1 is from Warren Avenue to Naval Avenue and would consist of pavement restoration and ADA ramp upgrades; Segment #2 is from Warren Avenue to Pacific Avenue and would construct the roadway to a community boulevard (multimodal facilities, landscaping, lighting, stormwater conveyance and treatment); Segment #3 is from Kitsap Way to Naval Avenue and consists of pavement restoration, ADA ramp upgrades and intersection safety improvements at Callow Avenue. Pedestrian crossing improvements and utility upgrades will be considered for the corridor. This project has a voluntary goal assigned, 10% SBE goal.

Anticipated disciplines and services may include, but are not limited to:

  • Bicycle, pedestrian and ADA accessibility design
  • Structural engineering
  • Bicycle and pedestrian facility design
  • Stormwater and drainage engineering
  • Environmental/permitting
  • Surveying and Right of Way (ROW) Services
  • Traffic Engineering
  • Geotechnical engineering
  • Landscape Architecture and urban design
  • Electrical engineering and illumination design
  • Utility coordination and design
  • Public involvement

Design work for the project will commence in **January 2027** and should be completed by **January 2028**. The City reserves the right to retain the services of the successful firm(s) for any subsequent phases (Right-of-Way, Construction engineering and inspection, & Construction Management) associated with this project. Construction of the project is scheduled for 2028.

The specific scope of services will be negotiated with the selected consultant and may be implemented through multiple phases, subject to project needs, funding availability, and City authorization.

Additional information

Submission

The city will only accept emailed proposals for this solicitation. All proposals shall be in PDF format and no greater than 10 MB in file size. Submittals should include the project name in the subject line and the following information in the body of the email: Project name; Firm name, phone and fax numbers; Name of Principal-in-Charge and Project Manager. Please email to vicki.grover@ci.bremerton.wa.us no later than **3 pm** (on the City Project Manager's Clock) on **December 1, 2026**. Submittals will not be accepted after that time and date.

The SOQ packet is limited to 10 pages, single sided only, not including the front and back cover or transmittal letter. Your SOQ must consist of:

  • Your letter of Transmittal.
  • Your responses to Evaluation Criteria 1 through 6.

Evaluation Criteria

Submittals will be evaluated and ranked based on the following criteria:

1. Qualifications and experience of Proposed Project Manager
2. Key Personnel to work on the project, including experience and availability
3. Ability to meet schedule
4. Approach to the Project
5. Familiarity with Bremerton/WSDOT/FHWA standards
6. Past Performance/References/Projects
7. Approach to meet the voluntary 10% SBE goal (SBE Plan)

Documents

1 file

Sign up free to get this document.

Similar open bids

In Washington

More from City of Bremerton

Open bids