Design & Install Alaska Long Trail Gateway Sign at Matanuska River Park

Active 27-057P RFPConstruction - Heavy & CivilMatanuska-Susitna Borough
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Matanuska-Susitna Borough (Alaska) posted this RFP on Oct 23, 2026. Responses are due Nov 9, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-11-02 17:00. Solicitation number 27-057P.

Solicitation details

General information

Solicitation number
27-057P
Notice type
RFP
Place of performance
Alaska
Questions due
2026-11-02 17:00

Agency and category

Agency
Matanuska-Susitna Borough
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Matanuska-Susitna Borough is soliciting proposals from qualified firms to provide professional design, fabrication, construction, and installation services for an Alaska Long Trail (AKLT) Gateway installation at Matanuska River Park & Campground (MRP) in Palmer, Alaska.

The project is funded through a grant intended to establish MRP as a visible and recognizable gateway to the Alaska Long Trail, improving visitor orientation, connectivity, interpretation, and trail identity.

The Borough anticipates the total contract value to be a firm fixed price under **$50,000**.

Scope

The selected contractor shall provide all labor, materials, equipment, supervision, and incidentals necessary to complete the Alaska Long Trail Gateway installation.

Task 1: Site Assessment & Concept Development

  • Conduct a site visit and evaluate conditions at Matanuska River Park & Campground.
  • Coordinate with Borough staff regarding site constraints, utilities, visibility, circulation patterns, and visitor access.
  • Develop a minimum of two conceptual design alternatives for review.
  • Incorporate principles of accessibility, durability, visitor orientation, and long-term maintenance.

Task 2: Gateway Design

The contractor shall develop final construction-ready designs for the Gateway installation, including:

  • Gateway structure(s) or monument feature(s).
  • Interpretive and wayfinding components.
  • Alaska Long Trail branding elements.
  • Site-specific mapping and orientation information.
  • Integration of Borough-provided content, logos, coordinates, and trail information.
  • Structural and foundation details are appropriate for Alaska climatic conditions.

Task 3: AKLT and Mat-Su Borough Brand Compliance

All design work shall comply with the Alaska Long Trail Style Guide and Mat-Su Borough Branding. The contractor shall be responsible for obtaining any required brand approvals from Alaska Long Trail and Mat-Su Borough representatives.

Task 4: Fabrication

  • Fabricate all Gateway components.
  • Utilize materials suitable for year-round outdoor exposure in Alaska.
  • Design for durability, vandal resistance, and minimal maintenance.
  • Provide color-fast finishes resistant to UV degradation.

Task 5: Construction & Installation

  • Prepare the site as required for installation.
  • Install all foundations, mounting systems, signage, and structural components.
  • Restore any disturbed areas to pre-construction conditions.
  • Coordinate installation activities with Borough staff to minimize disruption to park operations.
  • Provide final inspection and acceptance documentation.

Deliverables

  • Site Assessment Summary and Concept Development
  • Conceptual Design Alternatives
  • Schematic Design (30% Design)
  • Design Development (60% Design)
  • Final Construction Documentation (100% Design)
  • Installation Schedule
  • Completed Gateway Installation
  • Digital files of all graphics, maps, and design assets.
  • Warranty information and maintenance recommendations.

The services of the Consultant shall be completed by **June 3, 2027**.

Additional information

Proposals must be received through the Euna Procurement (MSB Procurement Portal) prior to the time fixed for closing date & time to be considered. Time of receipt will be determined by the MSB Procurement Portal.

Submissions received by mail, hand delivery, email, oral, or faxed will not be accepted and will not receive consideration.

The submittal page must be completed, signed (or eSignature) and returned with the proposal.

The Proposer whose proposal is accepted shall execute the Agreement and furnish the required insurance within five (5) working days after notice of Intent to Award is issued.

See Insurance Requirements in Sample Agreement, Section 27.

All public construction contracts exceeding $25,000 are subject to Alaska Statute 36.05.

Documents

2 files

Sign up free to get these 2 documents.

  • 27-057P Design Install Alaska Long Trail Gateway Sign at Matanuska River Park.pdf
    Download
  • A1. Proposed Sign Installation Location.pdf
    Download

Similar open bids

In Alaska

More from Matanuska-Susitna Borough

Open bids