The City of Sandy Springs is seeking a qualified contractor to conduct a Pavement Condition Index (PCI) assessment of approximately 302 miles of City-maintained roadways, as outlined in the Scope of Services below. The City has conducted six roadway condition evaluations since its inception, with the most recent evaluation completed in 2023.
1. The consultant shall conduct a physical field evaluation of the 302 centerline miles of City-maintained roadways, including both directions of travel. The evaluation shall include a rating of all roadway segments using a 0-100 Pavement Condition Index (PCI) scoring system consistent with ASTM D6433, Standard Practice for Roads and Parking Lots Pavement Condition Index Surveys, the methodology utilized by the Georgia Department of Transportation.
Recommendations shall be made as to which segments are suitable for simple resurfacing with patching, and which segments would qualify for full reclamation, compiled into four (4) individual budget recommendations.
2. The Consultant shall compare the current PCI results with the City's 2023 pavement condition evaluation to identify changes in pavement conditions and document the findings in the final report. [...]
3. The physical field evaluation of approximately 302 miles of City-maintained roadways shall include guardrail inspection and classification. [...]
4. The physical field evaluation of approximately 302 miles of City-maintained roadways shall include a Pavement Marking (Roadway-Striping) Assessment to document the type, location, and condition of pavement markings. [...]
5. The physical field evaluation of approximately 302 miles of City-maintained roadways shall include a Traffic Sign Inventory and Assessment to document the type, location, and condition of traffic control signs. [...]
6. Physical field evaluation shall include the evaluation of all City owned traffic calming devices such as concrete speed tables, concrete speed humps, concrete intersections, and concrete entrance treatments.
7. Pictures of selected significant roadway segments, guardrail areas, roadway pavement markings, and street signs should be included in the field survey and data reported.
8. The Consultant shall provide two presentations following completion of the required assessments and services: one to senior City management and one during a City Council meeting.
**Bids shall only be accepted online through the Bonfire Portal at:** https://sandysprings.bonfirehub.com/projects/260522/details
Any proposal submitted in any other format (email, paper, fax, mail, etc.) will not be accepted for any reason.
The selected contractor shall be able to start work within ten (10) calendar days after the "Notice to Proceed" is issued. The time of completion for the project is sixty (60) calendar days from the date of the "Notice to Proceed."
The total contract term shall be one hundred eighty (180) calendar days from the issuance of the Notice to Proceed.
The Prime Contractor shall perform a minimum of fifty-one percent (51%) of the total work required under this Contract using its own personnel and resources.
Failure to submit the following bid documents may result in the bid being deemed non-responsive and the bid shall be rejected: