City of Sandy Springs (Georgia) posted this ITB on Oct 13, 2026. Responses are due Nov 13, 2026. Category: Construction - Heavy & Civil. Solicitation number PE-66098-NONST-2027-000000152.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Sandy Springs is seeking bids from qualified contractors for the Dunwoody Road Gap Fill Sidewalk Project (T6026-2).
The project includes constructing approximately 340 linear feet of six-foot-wide sidewalk with a two-foot landscape strip near Dunwoody Road and Spalding Drive.
Project Location
1165 SPALDING DR & 1185 DUNWOODY RD NE, *Plan and Profile of Proposed Sidewalk Gap Fill Improvements*, Project No. T6026-2.
Additional work includes grading, curb and gutter installation, pavement markings, signage, utility adjustments, erosion control, and traffic management.
A SITE PRE-CONSTRUCTION MEETING AND A BUILDING PRE-CONSTRUCTION MEETING ARE REQUIRED AT THE BEGINNING OF THE PROJECT FOR ALL PERMITS EXCEPT TRADE PERMITS.
THE CONTRACTOR SHALL BID ON GRASSING COMPLETE, LUMP SUM.
PRICE BID FOR TRAFFIC CONTROL-LUMP SUM SHALL INCLUDE, BUT IS NOT LIMITED TO, CONSTRUCTION, MAINTENANCE, AND REMOVAL OF TEMPORARY SIGNING AND PAVEMENT MARKINGS, BARRICADES, CHANNELIZING DEVICES, ETC. REQUIRED FOR MAINTENANCE OF TRAFFIC DURING CONSTRUCTION.