Hawaii Department of Transportation (Hawaii) posted this IFB on Oct 8, 2026. Responses are due Dec 3, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-11-06 14:00. Solicitation number B27000533.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The receiving of bids for DOMESTIC AND FIRE WATERLINE SYSTEM REPLACEMENT AT PIER 51A, HONOLULU HARBOR, OAHU, HAWAII, JOB P10904, will begin as of the HIePRO Release Date. Bidders shall register and submit complete bids through HIePRO only.
The scope of work consists of the replacement of the existing fire protection and domestic water system within Pier 51A, including trench restoration and temporary phasing. The estimated cost of construction is between $10,000,000 and $13,000,000.
The work to be done under this contract shall include the furnishing of all labor, materials and equipment, and the supervision and services necessary to construct, complete in place, ready for use, all items of work in accordance with the drawings and these specifications. The Base Bid shall include the total work as shown or specified.
In general, the work shall include but not be limited to the following items of work:
Bidders shall submit and upload the complete proposal to HIePRO prior to the offer due date and time. Proposals received after said due date and time shall not be considered. **FAILURE TO UPLOAD THE PROPOSAL TO HIePRO SHALL BE GROUNDS FOR REJECTION.**
To be eligible for award, bidders shall possess a valid State of Hawaii General Engineering "A" license at the time of bidding.
Bid security shall be in an amount equal to at least five percent of the base bid and additive alternates.
Apprenticeship Preference. A five percent bid adjustment for bidders that are party to apprenticeship agreements pursuant to HRS § 103-55.6 is applicable to this project.
Employment of State Residents on Construction Procurement Contracts. Compliance with HRS § 103B-3 is a requirement for this project whereby a minimum of 80 percent of the bidder's work force on this project shall consist of Hawaii residents.
The award shall be made to the lowest, responsive, responsible bidder within 180 days after bid opening.