State of Missouri Office of Administration (Missouri) posted this IFB on Oct 21, 2026. Responses are due Dec 1, 2026. Category: Construction - Heavy & Civil. Solicitation number OA-FD40D70E.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The State of Missouri Division of Facilities Management, Design and Construction is soliciting bids for Big Lake State Park-Reclaim & Stabilize Marsh Phase 1 Campgrounds, Big Lake State Park, Craig, Missouri. Project Number: X2509-01.
Base Bid and Alternates
Alternate No. 1: Install approximately 750 feet of shoreline stabilization, tied concrete block mat with triple layer underlayment and associated work from Sta. 0+00 to 7+50.
Alternate No. 2: Install approximately 210 feet of shoreline stabilization, tied concrete block mat with triple layer underlayment and associated work from Sta. 30+00 to 32+00.
Alternate No. 3: Install approximately 305 feet of shoreline stabilization, tied concrete block mat with triple layer underlayment and associated work from Sta. 40+00 to 42+50.
All bid documents shall be emailed to FMDCBids@oa.mo.gov. **Bid Time: 1:30 PM**
Accompanying the bid is: 5% Bid Bond or Cashier's Check/Bank Draft for 5% of base bid that is payable without condition to the Division of Facilities Management, Design and Construction, State of Missouri, as per Article 5 of "Instructions To Bidders".
The Bidder agrees to complete the work within 120 working days from the date the Notice of Intent to Award is issued as modified by additional days added by the Owner's acceptance of alternates, if applicable. This includes ten (10) working days for document mailing and processing. The Bidder further agrees to pay to, or allow the State as liquidated damages the sum of $1,000 for each working day thereafter that the entire work is not substantially complete.
This project's specific goals are: MBE 0%, WBE 0%, and SDVE 3% or HDVE 3%.